STATEMENT OF CLAIM:
Claim of the General Committee of the
Brotherhood of Railroad Signalmen on the Louisville and Nashville Railroad
Company:
(a) That the Carrier violated the Signalmen's Agreement,
especially the Scope Rule, when, on February 14 and 15, 1961,
it assigned or permitted employes not covered by the Signalmen's
Agreement to unload signal material for use at the Decoursey Yard.
The material unloaded consisted of line wire, switch box rods,
ground rods, bond wires, parkway outlets, cross arms and other
signal material to be used at the Decoursey Yard. The amount of
time charged by the employes not covered by the Signalmen's
Agreement account of performing the above work amounted to a
total of 26 hours-10 hours on February 14, 1961, and 16 hours
on February 15, 1961.
(b) That the Carrier be required to compensate the senior furloughed Signal Helper on the Cincinnati Division for 26 hours at
the pro rata rate of pay account of the violation outlined in paragraph (a). (Carrier's File No. G-304-2; G-304)
EMPLOYES' STATEMENT OF FACTS: On February 14 and 15, 1961,
the Carrier assigned a Section Foreman and gang to unload signal material for a new yard installation at Decoursey, Kentucky. This material consisted of signal line wire, bond wires, parkway outlets, cross arms, and other
items necessary for construction of the signal facilities at Decoursey.
The material in question was left over from a signal construction project near Chattanooga, Tennessee. This material had been in possession of
signal forces for some time and was transported to Decoursey where track
forces unloaded it. The material was for immediate and future use by signal
forces installing the signal facilities at Decoursey.
In view of the obvious violation whereby the Carrier assigned employes
not covered by the Signalmen's Agreement to perform work covered by the
(3547
13578-8
361
ing systems; wayside devices and equipment for train stop and train
controls; car retarders and car retarder systems; power operated
gate mechanism; automatic or other devices used for protection
of highway crossings; spring switch mechanism; electric switch
targets together with wires and cables; train order signals in signaled territory and elsewhere within the limits of a signal maintainer's territory; power or other lines, with poles, fixtures, conduit
systems, transformers, arresters and wires or cables pertaining to
interlocking and signaling systems; interlocking and signal lighting; storage battery plants with charging outfits and switchboard
equipment; substations, current generating and compressed air plants,
exclusively used by the Signal Department, pipe lines and connections used for Signal Department purposes; carpenter, concrete and'
form work in connection with signal and interlocking systems.
(except that required in buildings, towers and signal bridges); together with all appurtenances pertaining to the above-named systems and devices, as well as any other work generally recognized
as signal work."
As previously stated by carrier, the signal material was unloaded by
section men for storage until such time as it was needed in connection with,
the construction of the new yard.
The unloading of signal material has not been considered the exclusive
work of signal employes. It has been the practice for years for signal materials to be unloaded by train crews, freight house employes and section men
into freight depots on line of road and stored there until it was used by signal employes.
The Board has held that the handling of signal material to be used by
signalmen at some future time is not exclusively signalmen's work. See Third
Division Awards 3826, 3689, 4797, 4978 and 5046.
In view of the circumstances involved, there is no basis for the employes'
claim, and same should be denied.
OPINION OF BOARD:
This claim involves section men unloading signal material February 14 and 15, 1961, from the car in which it had been
shipped to the Carrier's freight yard at Decoursey, Kentucky, for use in the
construction of signal facilities at the yard.
The Petitioner contends:
"The material in question was left over from a signal construction project near Chattanooga, Tennessee. This material had been
in possession of signal forces for some time and was transported
to Decoursey, where track forces unloaded it. The material was for
immediate and future use by signal forces installing the signal facilities at Decoursey."
The Carrier counters:
"The material in question was not shipped from a signal construction project near Chattanooga, but was material in the General Stores Department stock. It was loaded at the Stores Department at Louisville, Kentucky, by Stores Department employes; the
material had not been in possession of signal forces as contended
13578-9
369 -
and the material was not sent to Decoursey for immediate use. As
a matter of fact, the materials unloaded on February 14 and 15,
1961, as stated by carrier at page 2 of its submission, was not
used until the early part of June, 1961, when a signal gang was
formed to perform signalmen's work in the new yard."
It is apparent that there is a complete conflict of facts. This Board has
often held that it cannot resolve such conflicts, and that such claims should
be dismissed.
FINDINGS: The Third Division of the Adjustment Board, upon the
whole record and all the evidence, finds and holds:
That the parties waived oral hearing;
That the Carrier and the Employes involved in this dispute are respectively Carrier and Employes within the meaning of the Railway Labor Act,
as approved June 21, 1934;
That this Division of the Adjustment Board has jurisdiction over the
dispute involved herein.
AWARD
Claim dismissed.
NATIONAL RAILROAD ADJUSTMENT BOARD
By Order of THIRD DIVISION
ATTEST: S. H. Schulty
Executive Secretary