STATEMENT OF CLAIM: Claim of the System Committee of the Brotherhood that:
EMPLOYES' STATEMENT OF FACTS: A State Highway project near Tulsa, Oklahoma, required that a considerable amount of earth fill material be moved from one side of the Carrier's tracks to the other. The equipment used to transport this material crossed the Carrier's tracks at a public highway crossing near the West Third Street Viaduct and at Madison Avenue. The flashing crossing signals were removed from the Madison Street crossing while this work was in progress and outside forces were assigned to perform crossing watchman's work at each of these crossings. The work consisted of preventing vehicular traffic (public vehicles as well as earth moving equipment) from crossing the tracks when trains were approaching and also to keep the crossing clean and flangeways clear of debris.
The claimant (a trackman) was working at a point away from Tulsa, Lklahoma, but he had previously been regularly assigned at Tulsa. When he was required to leave Tulsa, he requested that he be returned thereto at the first opportunity in accordance with the provisions of Rule 6 of Article 2 which reads:
each side of the crossing. Entrance to industrial firms located east of and in the barricaded zone of Madison Avenue is accessible without using the rail crossing.
On July 19, 1968 north and south shoo-fly tracks (run-around tracks) from MP G-424 plus 27 poles to MP G-423 plus 03 poles were placed in service and the four existing tracks were removed from service for the construction of an underpass. Speed of trains on the shoo-fly tracks was restricted to 10 miles per hour. The grading contractor began using Madison Avenue as a haul road on or about July 15, 1968.
The contractor guarded the movement of his earth-hauling and other equipment to protect against accidents and personal injuries and hence the dispute that the Carrier permitted unauthorized personnel to encroach upon the rights of the employes covered by the Agreement between the parties.
OPINION OF BOARD: In the opinion of the Board, the showing in this docket does not warrant a finding that the guarding of the crossings in question with a crossing watchman, was work that the Carrier was under obligation to perform.
J. D. Metcalfe, Inc., a contractor for the Oklahoma Highway Department, had permission for the construction and use of a temporary private road crossing over and across the right-of-way tracks at Mile Post G-424-3. The contractor also used a barricaded crossing at Madison Avenue as a haul road.
To safeguard the movement of earth-hauling vehicles and other equipment over the Carrier's tracks the contractor provided his own crossing watchman.
The contractor's work was not related to or for the Carrier. The crossings were private. There was no requirement on the Carrier to provide protection. Accordingly, the claim should be denied.
FINDINGS: The Third Division of the Adjustment Board, upon the whole record and all the evidence, finds and holds:
That the Carrier and the Employes involved in this dispute are respectively Carrier and Employes within the meaning of the Railway Labor Act, as approved June 21, 1934;
That this Division of the Adjustment Board has jurisdiction over the dispute involved herein; and