NAT1nNAL RAILROAD ADJUSTMENT BOARD
THIRD DIVISION Docket Number MW-17355
(Brotherhood of Maintenance of Way Employes
PARTIES TO DISPUTE:
(The Atchison, Topeka and Santa Fe Railway Company
( - Coast Lines -
STATEMENT OF CLAIM: Claim of the System Committee of the Brotherhood that:
(1) The Carrier violated the Agreement when, on January 18 and 19,
1965, it assigned or otherwise permitted other than B&B forces to remodel
six (6) sets of concrete steps ("excavate, chip existing steps, form, mix,
pour and finish concrete platforms approximately 3' x 3' x 7" deep in conjunction with the bottom st
(Carrier's File 130-234-28)
(2) B&B Foreman D. E. McKee and B&B Mechanics C. W. Dickerson, C.
Madsen and R. Mares each be allowed nine (9) hours' pay at their respective
straight time rates because of the violation referred to in Part (1) of this
claim.
OPINION OF BOARD: Shop Extension Sheet Metal Workers of the Mechanical De
partment performed the work of installing a circulating
and drain piping complete with pumps for distribution and draining lubricating
oil on all ramps in the Diesel Shop at Barstow, California. These Sheet
Metal Workers placed two pipelines across the entrance to the stair;: entering
the depressed pits in the Diesel Shop. The concrete stairway was extended for
a distance of 3 feet. Carrier contends that it was necessary to place con
crete between the pipes and the first step in order to eliminate the hazard
of injury. The Organization contends that the new steps was part of the
structure and had nothing to do with pipes. The Organization further contends
that the pipe was not covered, but that the steps were brought up to the pipe.
A study of the exhibits involved in this case reveals that the pipe was not
covered, but that the concrete steps were extended by placing the concrete
slab between the pipe and the first step. The exhibit also reveals that it
was necessary to place the concrete slab in question in order to alleviate a
safety hazard. The new step became a part of the structure, and, therefore,
a part of the building. This new step, or concrete slab, also was connected
because of the placement of the pipes. This Board can not agree that this
was merely a "concrete slab" and not a "step". By elevating the concrete
above the pipe and extending it to the first step, this platform certainly
Award Number 19470 Page 2
Docket Number MW-17355
became a step. This Board also can not agree with the Organization that the
concrete slab, or step, had nothing to do with the pipe. We believe that the
argument between the parties as to whether this was a platform or a step is
a distinction without a difference.
Carrier places great weight in support of its argument on Award
19373 (Edgett). This Award is not in point in this case for the reason that
it was recited in Award No. 19373, as one of the controlling reasons for
denying the claim in that instance, that insufficient forces were available
at the time which made it necessary to use B&B Employees. That is not the
situation in this instance.
This Board finds that the involved concrete in its finished form
was elevated above the pit floor; was extended from the pipe a distance of
three (3) feet; was connected to the existing stairs; and thereby became one
of the stair-steps which was an integral part of the structure. This concrete
slab may have been placed there in order to alleviate a safety hazard, but,
nevertheless, became a step. Carrier contends that the Scope Rule in this
case is general in nature, and, therefore, the right of Claimants to the
involved work is dependent upon their proof of exclusivity by history, practice,
and tradition on a system wide basis. For the reason that this is the first
violation of this type alleged by this Organization, it would be an impossible
burden to require such proof. The involved work is work customarily performed
by Maintenance of Way Employees. This work is not customarily performed by
Shop Craft Employees. The involved work was an extension of a structure, and
under authority of Award No. 19306 (Devine), this claim will be sustained.
FINDINGS: The Third Division of the Adjustment Board, after giving the
parties to this dispute due notice of hearing thereon, and upon
the whole record and all the evidence, finds and holds:
That the Carrier and the Employes involved in this dispute are
respectively Carrier and Employes within the meaning of the Railway Labor
Act, as approved June 21, 1934;
That this Division of the Adjustment Board has jurisdiction over
the dispute involved herein; and
That the Agreement was violated.
A W A R D
Claim sustained.
NATIONAL RAILROAD ADJUSTMENT BOARD
By Order of Third Division
ATTEST:
Executive Secretary
Dated at Chicago, Illinois, this 30th day of October 1972.