NATIONAL RAILROAD ADJUSTMENT BOARD
THIRD DIVISION Docket Number SG-17642
(Brotherhood of Railroad Signalmen
PARTIES TO DISPUTE:
(Southern Pacific Company (Pacific Lines)
STATEMENT OF CLAIM: Claim of the General Committee of the Brotherhood of Railroad
Signalmen on the Southern Pacific Company (Pacific Lines) that:
(a) The Southern Pacific Company violated the current Signalmen's Agreement (effective Ap
it failed and/or declined to apply the Scope Rule, which resulted in the violation
of Rule 70, by assigning the recognized Signal Work of installing and maintaining
a "high load detector" connected to a signal system at M.P. 543.5, west of Riddle,
Oregon to employes not covered by the Classification Rules of the Signalmen's Agreement.
(b) Mr. L. W. Dixon be allowed thirty-two (32) hours at the time and one
half rate of his position for August 11 and August 12, 1966.
(c) Mr. L. W. Dixon be allowed one (1) hour at the time and one-half
rate of his position for each week, commencing November 1, 1966, and continuing
until the maintenance of this detector device connected to a signal system is
properly assigned to employes covered by the Classification Rules of our agreement.
(Carrier's File: SIG 152-212)
OPINION OF BOARD: This claim involves the question of whether or not Carrier
violated the Signalmen's Agreement when it assigned the work
of installing an electric eye .warning device to Maintenance of Way Electrical
Department employes at Riddle, Oregon. This warning device was for the purpose
of providing an additional aid to train crews watching for excessively high loads
in their trains when passing that point moving Westward. This installation included an electric ligh
specified elevation above the top of the rail by placing the transmitter and
receiver on 50 foot poles placed on each side of the track. When a Westward
train passed under this point and the electric light beam was broken by an excessively high load, a
on a post at the side of the track. The Signalmen's Organization contends that
the signal and horn constitute a signal system and that work in connection with
the installation and maintenance thereof is signal work covered by the Scope Rule
of the Signalmen's Agreement. Carrier, in denying this claim, has contended that
the installation forming the basis of this claim is a detector device not connected to nor part of t
Current Agreement, and that, therefore, Signal Department employes have no claim
to the installation or maintenance of said equipment. Carrier further contends
that electric eye devices on this property not connected with the signal system
Award Number 19605 Page 2
Docket Number SG-17642
have previously been installed and maintained by Maintenance of Way Electrical
Department employes; that the Organization in this dispute has failed in their
burden of proof for the reason that the involved work was not specifically
reserved by agreement provisions; and that the proof fails to show that Signalmen have performed the
this property. The record discloses that proper notice was given the Electricians'
Organization and that in their submission, the Electricians contend that Carrier
properly assigned the work in this dispute.
It is the opinion of this Board that the electric eye warning device
involved in this dispute became an integral part of Carrier's signal system upon
its installation and that the work of installing this device falls within the
Scope Rule of Signalmen's Agreement. The Scope Rule clearly states that the
construction and maintenance of wayside signals and wayside train stop, train
control equipment, and detector devices connected to signal systems accrues to
employes covered thereunder. Upon the installation of the warning device, it
became a part of Carrier's signal system, although Carrier infers otherwise,
because there were no physical attachments, such as wires, connecting it to
another signal function. The warning device set off both audible and visual
signals in the event of excessively high loads in passing trains, which, if
set off, required certain action on the part of the train crew. This Board does
not say, by this opinion, that all detector devices are included and are within
the Signalmen's Scope Rule. However, if the detector device cmits a visual or
audible signal that requires or. elininates action on the part of the train crew,
it is within the Scope Rule re;crving such installation and maintenance to Signalmen employes.
It is the further opinion of this Board that Claimant is entitled to
thirty-two hours at the straight rate of his position, but not at the time and
one-half rate as claimed for the reason that the p,initive rate cannot be allowed
for time not worked. Although this Claimant might have been fully employed
during the installation of the involved device, there is no showing that the
Claimant could not have installed the same during overtime or by Carrier rescheduling work. Therefor
straight rate. This Board further finds that part (c) of this claim should
be denied for the reason that there is a total lack of proof in the record of
any maintenance performed by anyone and this Board will not indulge in speculation as a basis for su
FINDINGS: The Third Division of the Adjustment Board, after giving the parties
to this dispute due notice of hearing thereon, and upon the whole
record and all the evidence, finds and holds:
That the Carrier and the Employes involved in this dispute are
respectively Carrier and Employes within the meaning of the Railway Labor Act,
as approved June 21, 1934;
l
Award Number 19605 Page 3
Docket Number SG-17642
That this Division of the Adjustment Board has jurisdiction over the
dispute involved herein; and
That the Agreement was violated in accordance with the Opinion.
A W A R D
Part (a) of Claim - Sustained.
Part (b) of Claim - Sustained in the amount of 32 hours at the
straight rate of pay.
Part (c) of Claim - Denied.
NATION-AL RAILROAD ADJUSTMENT BOARD
By Order of Third Division
ATTEST: ~ ~~ ~/~ i
Executive Secretary
Dated at Chicago, Illinois, this kith day of February 1973.