NATIONAL RAILROAD ADJUSTMENT BOARD
THIRD DIVISION Docket Number SG-19645
Irwin M. Lieberman, Referee
(Brotherhood of Railroad Signalmen
PARTIES TO DISPUTE:
(Southern Pacific Transportation Company (Pacific Lines)
STATEMENT OF CLAIM: Claim of the General Committee of the Brotherhood of
Railroad Signalmen on the Southern Pacific Transportation
Company (Pacific Lines):
(a) That the Southern Pacific Transportation Company has violated
and continues to violate the Memorandum of Agreement between the Southern
Pacific Company (Pacific Lines) and the Employes of the Signal Department
represented by the Brotherhood of Railroad Signalmen, SIG 116-56, dated
November 30, 1960, and particularly Paragraph 10 of the Memorandum which
specifically provides that Air Conditioning among other facilities shall
be provided at the Sacramento Signal Shop.
(b) We request that the Wiring and Blacksmith Shop sections of
Sacramento Signal Shop be promptly provided with Air Conditioning as speci
fied in Memorandum of Agreement in lieu of the _Swamp Coolers and portable
fans now provided. /Carrier's File: Sig 60-39/
OPINION OF BOARD: In June 1961 Carrier established a System Signal Shop
at Sacramento. This shop occupies two buildings accomo
dating four different work activities: a machine shop, relay shop, wiring
shop and blacksmith shop. We are concerned herein with the building occupied
by the wiring shop and the blacksmith shop. In contemplation of the estab
lishment of the System Signal Shop, the parties entered into a Memorandum
of Agreement effective November 30, 1960 which provided among other items
in Section 10:
"10. Adequate heat, air conditioning, washing and toilet
facilities shall be provided at the new Sacramento Shop..."
Petitioner contends that the; evaporative air cooling system with
auxiliary fans installed by Carrier in 1961 is neither air conditioning nor
adequate as provided in the Agreement of November 1960. Petitioner presented
no evidence whatever on the property in support of its position, although
some data concerning temperatures inside the facility, which must be disregarded, was submitted duri
agree with Petitioner's contention with respect to the system, since we hold
that "air conditioning" is a generic term which applies to both evaporative
and refrigerative systems.
Award Number 19959 Page 2
Docket Number SG-19645
Most importantly, disregarding Carrier's speculative assertion
with respect to the Organization's motivation in bringing this claim, we
recognize the interest of both parties in their being satisfactory working
conditions for the employes affected. Since the record discloses no probative evidence with respect
there were no complaints for almost ten years, we can find no support for
the Organization's position. We have held in many Awards over the years
that when there is any doubt as to the intent of the parties or the meaning
of an ambiguous contract provision, the conduct of the parties over a period
of time is the best evidence of their intent (Awards 14240 and 14936 for example). Although we canno
above, we are certain that the essential mutuality of interest of both parties in resolving the issu
FINDINGS: The Third Division of the Adjustment
Board, upon
the whole record
and all the evidence, finds and holds:
That the parties waived oral hearing;
That the Carrier and the Employes involved in this dispute are
respectively Carrier and Employes within the meaning of the Railway Labor
Act, as approved June 21, 1934;
That this Division of the Adjustment Board has jurisdiction over
the dispute involved herein; and
That the Agreement was not violated.
A W A R D
Claim denied.
NATIONAL RAILROAD ADJUSTMENT BOARD
~ By Order of Third Division
ATTEST:
W