NATIONAL RAILROAD ADJUSTMENT BOARD
THIRD DIVISION Docket Number MW-22323
James F. Scearce, Referee
(Brotherhood of Maintenance of Way Employes
PARTIES TO DISPUTE:
(The Baltimore and Ohio Railroad Company
STATEMENT OF CLAIM: "Claim of the System Committee of the Brotherhood
that:
(1) The Carrier violated the Agreement when it assigned
electricians instead of B&B forces to paint the substation at
Cumberland, Maryland on September 6, 1976 (System File CUM-653/2-MG1680).
(2) Carpenters, R. G. Kerns, W. W. Hott, J. R. Haines,
S. R. Durst, R. W. Haines, Jr. and J. Smith each be allowed pay at
their respective time and one-half rates for an equal proportionate
share of the fifty-four (54) man-hours expended by electricians in
performing the work described in Part (1) hereof."
OPINION OF BOARD: Claimants in this case are employed as Carpenters
in Carrier's B&B Department. They were available
for work when on September 6, 1976, Carrier utilized Electricians to
perform certain painting work at the electric sub-station at
Cumberland, Maryland. The work consisted of painting the steel
structures of the sub-station to which the electric apparatus -
insulators, wire, switches, etc., - is attached.
Petitioner has pointed to Rule 1(c) of their Agreement which
says:
"(c) Bridge, Building and Structural Work.
"Carpentry, painting, glazing, tinning, roofing,
plastering, bricklaying, paving, masonry and
concreting required in the construction and
maintenance of railroad structures, other than
tunnels, _shall be performed by the B&B forces.
Such work in tunnels and all concreting by the
gunite method shall be performed by tunnel forces."
Award Number 22428 Page 2
Docket Number MW-22323
Petitioner has further argued that "this is the first time
in fifty or more years that other than Maintenance of Way forces
were used to paint this structure."
Carrier has said that since this sub-station was constructed
in 1955, the Electrical forces "have painted the steel structure as
needed."
The Electrical Workers, who were involved here as an interested third party, have told us that:<
"Carrier's Electrical forces has (sic) built and
maintained (including painting) electrical substations at least as far back as 1924
and that:
"The work involved in the instant case is actually
the third time the Electricians have comnletelv
painted this particular substation."
(Underscore in original)
The record in this case contains dramatic conflicts in the
evidence, allegations and assertions which are presented by the parties
to the dispute. It is well established that this Board has no way
of resolving conflicts in the factual evidence of any dispute. In
Award No. 16152 (Ives) of this Division we find:
"Analysis of the conflicting evidence offered by the
parties in support of their respective positions discloses an irreconcilable conflict of facts, and
well established that the burden of proof rests with
the Claimant in such disputes. Awards 15597 and
15765."
That logic is equally applicable here. There simply are not
sufficient evidentiary facts in this case to permit a finding that
Carrier violated the provisions of Rule 1(c) in this particular instance.
Accordingly the claim will be d_smissed.
Awar: Number 22428 Page 3
Docket Number NW-22323
FINDINGS: The Third Division of the Adjustment Board, upon the whole
record and all the evidence, finds and holds:
That the parties waived oral hearing;
That the Carrier and the Employes involved in this dispute
are respectively Carrier and Employes within the meaning of the
Railway Labor Act, as approved June 21, 1934;
That this Division of the Adjustment Board has jurisdiction
over the dispute involved herein; and
Claim dismissed in accordance with Opinion.
A W A R D
Claim dismissed.
NATIONAL RAILROAD ADJUSTMENT BOARD
By Order of Third Division
ATTEST:
Executive ecretary
Dated at Chicago, Illinois, this 15th day of June 1979.