NATIONAL RAILROAD ADJUSTMENT BOARD
THIRD DIVISION Docket Number MW-22428
George S. Roukis, Referee
I
(Brotherhood of Maintenance of Way Employes
PARTIES TO DISPUTE:
(Seaboard Coast Line Railroad Company
I
STATEMENT OF CLAIM: "Claim of the System Committee of the Brotherhood
that:
(1) The Carrier violated the Agreement when, without a
conference having been held between the Assistant Vice President,
Engineering and Maintenance of Way and the General Chairman as required
by Rule 2, it assigned work of the Maintenance of Way and Structures
Department at Castle Bayne, North Carolina to outside forces on May
25 and 26, 1976 LSystem File 12-2(76-37)
C2/
(2) Because of the aforesaid violation, Mr. L. Moore be
allowed the difference between what he should have received at the
Group A, Class III Machine operator's rate and what he was paid at the
trackman's rate for sixteen (16) hours."
OPINION OF BOARD: In this case, there is no dispute regarding the
type of work performed at the highway crossing
located at Castle Bayne, North Carolina. The disagreement centers
around the question whether the work belonged to the Maintenance of
Way forces.
Claimant contends that Carrier violated Agreement Rule 2
when it permitted the North Carolina State Highway Department to use
a state owned front end loader - backhoe and operator to remove old -
pavement, ballast, flange boards and crossties and to replace ballast
at this grade crossing. He asserts that Carrier unilaterally assigned
this work to outside forces without properly observing Rule 2's
specified provisions. This Rile which is quoted in pertinent part
hereinafter reads,
"This Agreement requires that all maintenance work in
the Maintenance of Way and Structures Department is
to be performed by employees subject to this Agreement
I
Award Number 22591 Page 2
Docket Number MW-22428
"except it is recognized that, in specific instances,
certain work that is to be performed requires special
skills not possessed by the employees and the use of
special equipment not owned by or available to the
Carrier. In such instances, the Assistant Vice-President,
Engineering and Maintenance of Way, and the General
Chairman will confer and reach an understanding setting
forth the conditions under which the work will be performed."
i
Carrier, on the other hand, argues that the contested work
was traditionally performed by the State Highway Department and reflects
the normal division-of labor between the Maintenance of Way forces and
the government when they cooperatively participated in similar assignments. In essence, the Highway
portion of the work, while the Maintenance of Way forces performed the
trackwork. Moreover, Carrier contends that Bile 2 is inapplicable in
the present circumstances since the work was not in the literal sense
of the term a compensatory contracting out arrangement.
In our review of the case, we agree with Carrier that the
work was not contracted out within the traditional meaning of the term.
The work was performed at the Commonwealth's expense in conjunction
with the Maintenance of Way forces. A careful reading of Rule 2
reveals that it is purposely designed to 'pure and protect that a=11
maintenance work will be performed by the Maintenance of Way forces,
except that in clearly specified circumstances where special skills
or equipment are unavailable, a conferral procedure is required.
In this situation there were no assertions that these
conditions were present. Carrier argued that the work belonged to
the State Highway Department and was not contracted out. In Third
Division Award 22274, involving the same parties, this Division held
that the Chamber of Commerce's utilization of volunteer prison labor
to paint a rail depot was not beyond the bounds of this provision if
it affected protected work. This decisional rationale is applicable
herein. The test is the protection of work not the payment for
outside services.
I
Carrier performed road clearance work that included the -,
removal of ballast, flange boards and crossties, etc. It was done
at the point where the public highway crossed Carrier's track.
Admittedly, the rehabilitative work was a jointly determined task,
but its nature and location was fraught with potential conflict.
I
Award Number 22591 Page 3
Docket Number MW-22428
It is this gray area that is in contention.
Carrier, to be sure, performed road clearance work that was
an integral part of its highway maintenance responsibility, but when
the task specifics and location are carefully
examined,
we find that
the work belonged to the Maintenance of Way forces. We recognize,
of course, that a fine line oftentimes exists in disputes of this
type, but the work did not require specialized skills or equipment.
It was traditionally performed by Maintenance of Way forces and
encompassed methods and machinery that were protected by Agreement
language. We will sustain the claim.
FINDINGS: The Third Division of the Adjustment Board, upon the whole
record and all the evidence, finds and holds:
That the parties waived oral hearing;
That the Carrier and the Employes involved in this dispute
are respectively Carrier and Employes within the meaning of the
Railway labor Act, as approved
June 21,
1934;
That this Division of the Adjustment Board has jurisdiction
over the dispute involved herein; and
That the Agreement was violated.
A W A R D
Claim sustained.
NATIONAL RAILROAD ADJUSTMENT BOARD
By Order of Third Division
ATTEST:
Executive Secretary
Dated at Chicago, Illinois, this '^Oth day of October
1979.