NATIONAL RAILROAD ADJUSTMENT BOARD
THIRD DIVISION Docket Number SG-24729
Ida Klaus, Referee
(Brotherhood of Railroad Signalmen
PARTIES TO DISPUTE:
(Missouri Pacific Railroad Company
STATEMENT OF CLAIM: Claim of the General Committee of the Brotherhood of Railroad
Signalmen on the Missouri Pacific Railroad Company:
(a) Carrier violated the May 1, 1964 Signalmen's Agreement, as amended,
particularly the discipline Rule 700, when it suspended Signal Maintainer H. P.
Heard thirty (30) days actual without just and sufficient cause and on the
basis of unproven charges either before or during the investigation held May 4,
1981. Claimant was not charged on any specific day, month or year, in connection
with his reported failure to properly inspect and test signal system assigned
to his care, that resulted in the failure of 69A track circuit relay at MP
(389+10) Little Rock Subdivision failing to de-energize with a shunt of 0.06
ohms resistance placed across the rail of the track circuit at the clearance
point of switch located MP 388+44.
(b) Carrier should now be required to make Signal Maintainer H. P.
Heard whole for the thirty (30) days he was suspended in line with his Monthly
Rate of Pay and clear his record of the charges, as provided in Rule 700(()
since the charges against him were unproven, and account of violation of Rule
700(d) by the Carrier. (Carrier file: K 225-8861
OPINION OF BOARD: The Claimant was employed as a Signalman for thirty years
at the time this grievance arose. It is one of his duties
as a Signalman to maintain the necessary level of resistance in the track
circuit so that the relay will display a proper signal to oncoming trains. The
level of resistance is tested by placing a shunt of 0.06 ohms resistance on the
track and determining if the track is de-energized.
On January 8, 1981 the Claimant made a shunt test of 69A track and
obtained a meter reading of zero. He did not visually check the relay. From
January 8 until March 16, when he left for a three-week vacation, the Claimant
did not again test 69A track. He returned from vacation on April 6, 1981. On
Wednesday, April 8 an FRA Inspector performed a shunt test on 69A track and
visually inspected the battery case, finding the relay in an energized position.
After an investigation, the Carrier found that the Claimant failed
properly to inspect and test the signal system under his care, which inaction
thus resulted in the failure of 69A track relay to de-energize during the shunt
test on April 8, 1981. The Carrier imposed a thirty-day suspension. The claim
protests the suspension as unwarranted, and it seeks reimbursement.
In support of its determination, the Carrier maintains that the
claimant's failure to visually check the relay during the January 8 shunt test
was the cause of the relay failure. It stresses that a zero meter reading was
unreliable. In addition, the Carrier asserts that no other persons or conditions,
such as weather or ballast, could have caused the failure after January 8. If
there were such conditions, it says, the Claimant was negligent in the performance
of his duty by failing to recognize and correct them before the FRA shunt test
on April 8.
Award Number 25176 Page 2
Docket Number SG-24729
The Organization's main
contention is
that the Carrier has failed to
point to any specific action or inaction by the Claimant which could reasonably
establish improper performance of duty on his part. The Organization maintains
that the Claimant correctly performed the January shunt test and conscientiously
performed his duties between that test and the FRA test on April 8. The Organization
also alleges several procedural irregularities, including a charge that the
Carrier violated Rule 700(d) by not sending a copy of the investigation transcript
and a notice of discipline imposed to the Claimant's representatives within ten
days of the hearing. A charge was also made that the investigation was unfair
and partial.
Upon careful review of the entire record, the Board concludes that
the claim must be sustained. There is not substantial evidence to warrant a
finding that the Claimant failed to properly perform his duties; nor is there
substantial evidence to indicate that the failure of the relay found in the FRA
test could only have been the result of a breach of duty by the Claimant.
There is no basis in the record for an inference that the Claimant
caused the failure of the relay by his action or failure to act. There is no
testimony whatever that a zero meter reading during a shunt test is unreliable,
nor is there
convincing evidence
that a visual check of the relay is necessary
upon obtaining a zero meter reading. Rule 604 does not require a visual check
as a matter or course. The Claimant credibly and reliably testified from his
30-year experience that a meter reading is the standard way of checking the
circuit and that a reading of zero is within the acceptable range.
Moreover, no acceptable reason has been shown why the Claimant should
have made a further test of 69A track between January 8 and March 16. There is
no evidence to show that changing conditions which could have affected the
track circuit occurred during that period. Aside from speculation, the only
evidence of conditions which would have affected the readings, such as the
removal of the temporary roadway., were shown to have occurred while the Claimant
was on vacation. With regard to the need for the Claimant to check the track
circuit immediately upon return from vacation, it is reasonable to observe that
if the Carrier itself did not consider it necessary to make a check immediately
upon removal of the temporary crossing, then it could not fairly blame the
Claimant for failure to do so. The Carrier has not been able to credibly
demonstrate that other persons or conditions could not have been the cause of
the relay failure on April 8. Accordingly, we must sustain the claim.
We do not accept the Organization's procedural
contentions. While
the procedural provisions of the Agreement should be honored, the failure to do
so in all instances is not necessarily fatal. It has not been shown that the
delay in furnishing the transcript and notice of discipline was in any way
prejudicial to the Claimant's case, either in terms of fairness or his ability
to pursue the grievance. No specific allegations of bias were pointed out in
the conduct of the
investigation and
no indication of bias appears on the
record. The errors in the transcript of the
investigation are
minor and do not
render it an inaccurate record of the proceedings. The Claimant shall be reimbursed
for all wages lost as the result of the suspension.
Award Number 25176 Page 3
Docket Number SG-24729
FINDINGS: The Third Division of the Adjustment Board, upon the whole record
and all the evidence, finds and holds:
That the parties waived oral hearing;
That the Carrier and the Employes involved in this dispute are
respectively Carrier and Employes within the meaning of the Railway Labor Act,
as approved June 21, 1934;
That this Division of the Adjustment Board has jurisdiction over the
dispute involved herein; and
That the Agreement was violated.
A W A R D
Claim sustained.
NATIONAL RAILROAD ADJUSTMENT BOARD
By Order of Third Division
Attesti~_
Nanc 7V.e-.r- Executive Secretary
Dated at Chicago, Illinois, this 14th day of December 1984.