NATIONAL RAILROAD ADJUSTMENT BOARD
THIRD DIVISION Docket Number MW-26125
(Brotherhood of Maintenance of Way Einployes
PARTIES TO DISPUTE:
(The Chesapeake and Ohio Railway Company
(Southern Reqion
STATEMENT OF CLAIM: "Claim of the System Committee of the Brotherhood that:
1. The ten (10) days overhead suspension imposed upon Machine Operators C. A. Britt and W. L. Pa
and sufficient cause and on the basis of unproven charges (System File C-D1929/MGr4284).
2. The claimants' records shall be cleared of the charges leveled
against then and they shall be compensated for all wage loss suffered if any."
OPINION OF BOARD: On August 31, 1983, the Claimants attended an Investigation
after being charged with failure to properly operate their
machines on August 11, 1983, resulting in damage.
At the Hearing Claimant Park, an employee since 1974 and a Machine
Operator since 1978, stated he was the Machine Operator of Ballast Regulator
BRD522 on August 11, 1983. He had operated it since May, 1983, and similar
equipment since 1979. He stated the machine was damaged when he came backwards through an area he ha
caught a rail which was not spiked at the end and had moved. Park stated the
damage could have been avoided if the switch and rail had been properly removed. He stated he did no
rail in the area which he had seen before beginning to operate. He admitted
if he had raised the front plow the rail would not have been struck. Supervisor, Work Equipment Mill
to be aware of obstructions in the track.
Britt, a Laborer, had operated the Junior Tamper PTF717 for about 3
hours and 45 minutes that day before the damage to it. He was operating it
because the regular Operator was on vacation. He has no operators rights. He
received instructions from Foreman Conrad before operating it. He testified
damage occurred when he tamped the last tie before a crossing. He was moving
the Tamper to the other side of the crossing. The head was down and hit the
crossing. He did not lock the heads up as he could have. Britt stated the
damage could have been prevented by having a qualified operator on the
machine. He did not know to lock the heads before moving over a crossing.
Award Number 26211 Page 2
Docket Number MW-26125
The Foreman testified he briefly instructed Britt with the intention
of getting back and going into more detail. He also stated the area had an
overabundance of scrap, turned rails, tie plates and angle bars and he had
brought this to the attention of the Assistant Supervisor - Track.
Damage to the BRD522 amounted to $6,090.58. Damage to the PTF totaled $821.24.
After the Investigation both Claimants were notified "it has been
found that you were at fault for failure to properly operate your machines"
and the "discipline assessed is ten (10) days overhead suspension for a period
of six (6) months."
The organization contends Carrier relies solely on damage to the machines as evidence that Claimants
shows Claimants didn't follow proper procedures in operating their equipment.
Accordingly Carrier's discretion in assessment of discipline should not be
disturbed absent a showing that it was malicious, vindictive or arbitrary.
This Board agrees substantial evidence was produced at the Hearing to
allow Carrier to conclude there was a failure to properly operate the machines
in question. As to Claimant Britt, however, we believe there are mitigating
circumstances. He was not an Equipment Operator. He had very little training
and had operated the machine for a total of slightly more than three hours.
The Foreman admits he only briefly instructed Britt, intending to go into more
detail later. Britt testified he didn't know he should lock the heads at
crossings and that was not contested. In view of these mitigating circumstances, we shall require th
of Claimant Britt.
FINDINGS: The Third Division of the Adjustment Board, upon the whole record
and all the evidence, finds and holds:
That the parties waived oral hearing;
That the Carrier and the Employes involved in this dispute are
respectively Carrier and Employes within the meaning of the Railway Labor Act
as approved June 21, 1934;
That this Division of the Adjustment Board has jurisdiction over the
dispute involved herein; and
That the Agreement was violated.
Award Ntanber 26211 Page 3
Docket Number MW-26125
A W A R D
Claim sustained in accordance with the opinion.
NATIONAL RAILROAD ADJUSTMENT BOARD
By Order of Third Division
010
Attest:
Nancy J. Deer - Executive Secretary
Dated at Chicago, Illinois, this 15th day of January 1987.