Form 1 NATIONAL RAILROAD ADJUSTMENT BOARD Award No. 28998
THIRD DIVISION Docket No. MW-27870
91-3-87-3-390
The Third Division consisted of the regular members and in
addition Referee John B. LaRocco when award was rendered.
(Brotherhood of Maintenance of Way Employes
PARTIES TO DISPUTE:
(Terminal Railroad Association of St. Louis
STATEMENT OP CLAIM: "Claim of the System Committee of the Brotherhood that:
(1) The Carrier violated the Agreement when it assigned outside
forces to perform welding work on the Eads Bridge on May 12, 13 and 14, 1986
(System File 1986-9 T.R.R.A./013-293-14).
(2) As a consequence of the aforesaid violation, Bridge and Building
Mechanic Welders K. Case and E. Harper shall each be allowed twenty-four (24)
hours of pay at their respective straight time rates."
FINDINGS:
The Third Division of the Adjustment Board, upon the whole record
and all the evidence, finds that:
The carrier or carriers and the employe or employes involved in this
dispute are respectively carrier and employes within the meaning of the
Railway Labor Act as approved June 21, 1934.
This Division of the Adjustment Board has jurisdiction over the
dispute involved herein.
Parties to said dispute waived right of appearance at hearing
thereon.
On April 1, 1986, the Carrier notified the Organization of its intent
to retain an outside contractor to resurface the main span and the east end
approaches to Eads Bridge. At an April 14, 1986 conference, the Organization's General Chairman obje
plate welding work as part of the paving project. On the three Claim dates,
employees of either the paving contractor or a subcontractor welded plates on
the bridge deck to patch holes and cracks.
On the property, the Carrier's two main reasons for contracting out
the welding work were that patching holes was integrated with the paving project and the Carrier was
building (B&B) mechanics. The Carrier intimated that if B&B mechanics had
performed the disputed work, it would have had to interrupt ongoing scheduled
bridge maintenance projects.
Form 1 Award No. 28998
Page 2 Docket No. MW-27870
91-3-87-3-390
The Organization accused the Carrier of acting in bad faith because
it failed to reduce the amount of work it was contracting out in accord with
the December 11, 1981 Letter Agreement. The Organization also asserted that
B&B mechanics (qualified welders) have performed this type of welding function
in the past.
At the onset, this Board notes that, in its submission to this Board,
the Carrier, for the first time, contended that the disputed work was not
within the purview of the scope clause of the applicable Agreement. Inasmuch
as this argument was not raised on the property, the Board validates the Organization's unrefuted al
Carrier farmed out work reserved to covered employees by the Scope Rule.
Although we find that the Carrier acted in good faith and it fully
complied with Article 4 of the 1968 National Agreement, the plate welding task
was preparatory work which could have been easily segregated from the paving
project. At a heavy construct;on site, it is not unusual to have workers from
different crafts performing different work. Third Division Award 19578. Assigning qualified bridge a
would not have impeded completion of the entire resurfacing project. Indeed,
the description of the work given by both parties lends support to the Organization's position that
almost any time prior to the actual paving. Thus, the welding was distinct
from the resurfacing work.
Finally, the Carrier demonstrated that there was a shortage of manpower in the bridge and building s
the Board is unable to ascertain if the Carrier was experiencing a labor
shortfall or an extraordinary heavy workload or both. In any event, the manpower shortage was prolon
work belonging to the craft and class of bridge and building mechanics.
A W A R D
Claim sustained.
NATIONAL RAILROAD ADJUSTMENT BOARD
By Order of Third Division
Attest
Nancy J. er - Executive Secretary
Dated at Chicago, Illinois, this 24th day of September 1991.