Form 1 NATIONAL RAILROAD ADJUSTMENT BOARD Award No. 29237
THIRD DIVISION Docket No. MW-28761
92-3-89-3-142
The Third Division consisted of the regular members and in
addition Referee William E. Fredenberger, Jr. when award was rendered.
(Brotherhood of Maintenance of Way Employes
PARTIES TO DISPUTE:
(Burlington Northern Railroad Company (former St. Louis( San Francisco Railway Company)
STATEMENT OF CLAIM: "Claim of the System Committee of the Brotherhood that:
(1) The disciplinary disqualification of Locomotive Crane Operator D.
0. Ferguson for alleged violation of Rules 319 and 321 in connection with
overturning Locomotive crane BC-7 at Arcadia, Kansas on September 22, 1987 was
on the basis of unproven charges. (System File B-2060/EMWC 88-2-19 SLF).
(2) As a consequence of the violation referred to in Part (1) hereof,
the Claimant shall be reinstated as a crane operator, he shall be paid for all
wage loss suffered and his record shall be cleared of the charges leveled
against him."
FINDINGS:
The Third Division of the Adjustment Board, upon the whole record
and all the evidence, finds that:
The carrier or carriers and the employe or employes involved in this
dispute are respectively carrier and employes within the meaning of the
Railway Labor Act as approved June 21, 1934.
This Division of the Adjustment Board has jurisdiction over the
dispute involved herein.
Parties to said dispute waived right of appearance at hearing
thereon.
On September 22, 1987, Claimant was working as the operator of Bridge
Crane No. 7 in connection with replacing the spans of bridge 114.6 at Arcadia,
Kansas. Also at the site was Bridge Crane No. 5 with its operator. Additionally, B&B Gang 826 wi
decking in preparation for setting new concrete spans. The Foreman, Claimant
and the other crane operator conferred. Claimant and the other operator
agreed that Claimant's crane was capable of lifting and removing the decking,
and they so informed the Foreman. The crane was setting on over four inches
of track elevation. The crane's line was attached to one end of the decking
after which Claimant lifted and flipped it as planned. However, the decking
did not clear the parapet pilings of the bridge which necessitated a second
lift. When Claimant lifted the decking a second time it dislodged from the
Form 1 Award
No. 29237
Page 2 Docket
No. MW-28761
92-3-89-3-142
parapet pilings, swung out and away from the crane and tipped the crane over.
Claimant sustained a personal injury and there was approximately
$50,000
damage to the crane.
By letter of September
25, 1987,
the Carrier notified both Claimant
and the Foreman to appear for formal Investigation to determine the facts and
responsibility in connection with Crane
No. 7
overturning on September
22
in
possible violation of several cited rules. The Investigation was held on
October 6,
1987.
The Foreman was exonerated of responsibility- However, by
letter of October 16,
1987,
the Carrier notified Claimant that inasmuch as the
Investigation developed that he was not aware how close to the load limit his
crane was while handling the bridge deck he had violated Rule
319
requiring an
operator to know the load his machine is capable of handling and Rule
321
requiring that outward drift of the load be considered when handling loads
near the maximum crane capacity. The letter also stated that Claimant was
disqualified as a Bridge Crane operator, that his name would be removed from
the bridge crane operator's seniority roster and that he could place himself
on any position his other seniority, unaffected by the Carrier's action, would
allow.
The Carrier argues that the record in this case fully supports the
discipline. The Carrier emphasizes that while the rules and practices pertaining to crane operation
of his crane and to operate it within such restrictions Claimant did not know
and made no attempt to actually learn of the weight of the old bridge decking.
The Carrier points out that Claimant estimated that weight to be approximately
20,000
pounds when in actuality it was
25,000
pounds. The Carrier also points
out that it view of the boom radius of the crane and the elevation in the
track the maximum weight which the crane could lift was
19,000
pounds. Accordingly, Claimant negligently failed to ascertain the lifting capacity of
his crane.
The Organization maintains that the Carrier has failed to sustain its
burden of proof in this case inasmuch as the record establishes that the crane
overturned due to factors other than those cited by the Carrier. The Organization emphasizes that th
direction in which it eventually fell. In this connection the Organization
argues that, contrary to the Carrier's position, Claimant cannot be faulted
for failing to deploy the outriggers of the crane because it was established
practice not to do so when it was necessary for the crane to make several
moves, as it was in this case, and because the crew had just installed ballast
making the area where the outriggers would be placed too soft for effective
support. The Organization also alleges that Claimant was not made aware of
the fact that the load had become wedged or stuck on the parapet pilings of
the bridge after the first lift and toss and that, accordingly, when the load
was freed on the second lift it shifted unexpectedly. Finally, the Organization contends that Claima
Thus, argues the Organization, Claimant should not be held responsible for the
crane overturning.
Form 1 Award No. 29237
Page 3 Docket Yo. MW-28761
92-3-89-3-142
Our review of the record in this case leads us to conclude that it
fully supports Claimant's responsibility for the accident.
Rule 319 requires a crane operator to use care to avoid overloading
the crane and in that connection to be familiar with the load capacity or
limits of the crane at various radii. Clearly, the Rule contemplates that the
crane operator will know or ascertain with some degree of accuracy the weight
of the load to be lifted. A Supervisor of Work Equipment, General Bridge
Supervisor and Bridge Engineer each testified that it is the responsibility of
the crane operator to know the weight of the load he is lifting. The Supervisor of Work Equipment al
crane operators to ask or inquire about the weight of loads they may be required to handle. Addition
times crane operators had made inquiry of him as to the weights of bridge
components.
In this case Claimant made no inquiry of any responsible Carrier official as to the weight of th
bridge. Rather, he relied upon his own experience in estimating the weight to
be 20,000 pounds. Moreover, Claimant apparently relied heavily upon the
opinion of the other crane operator that Claimant's crane could handle the
load. Claimant underestimated the weight of the load by 5,000 pounds. The
capacity of Claimant's crane to make the particular lift at issue in this
case, which the record demonstrates also was Claimant's responsibility to
know, was 19,000 pounds. Accordingly, the crane would have been overloaded
even if Claimant's estimate of the weight of the decking had been correct.
Claimant knew or should have known that he was operating the crane near its
maximum capacity and, as charged by Rule 321, should have considered the possibility of the load swi
elevation of the track caused the crane to tilt or lean.
While we agree with the Organization that in view of the established
practice on the property and the facts of this particular case Claimant cannot
be faulted for his failure to use the outriggers on the crane, we cannot accept the fact that the el
knew of the elevation. When Claimant learned that the other crane at the site
had experienced no problem the previous day when driving piles while on the
elevation, Claimant concluded that his crane which was larger than the other
crane could lift the load from the elevation with no problem. Undoubtedly the
elevation contributed to the crane turning over. However, it was Claimant's
responsibility to ascertain the lifting capacity of his crane on the elevated
track. His misestimate as to the weight of the load to be lifted contributed
significantly to his failure in such responsibility.
The same is true of the fact that Claimant may not have realized that
the bridge decking had become wedged or stuck on the bridge parapets. Claimant knew he was operating
that in such a circumstance the crane operator must anticipate that the load
may swing out. However, Claimant's misestimate of the weight of the load prevented him from correctl
out, i.e., the crane turning over.
Form 1 Award No. 29237
Page 4 Docket No. MW-28761
92-3-89-3-142
While it may be true that Claimant never received formal training in
crane operation, it must be borne in mind that Claimant had operated a crane
for approximately three years prior to the incident in this case during which
time Claimant learned the duties and responsibilities of the position. Claimant indicated his knowle
applicable to the particular lift at issue in this case. Claimant knew and
understood that he was responsible for ascertaining the weight of the bridge
decking to be lifted. Claimant chose to rely upon his judgment in estimating
the weight of the load rather than taking steps to more accurately ascertain
its weight. Claimant's error in judgment cannot be attributed to the lack of
proper training.
In the final analysis we must conclude that the record establishes
Claimant's guilt as charged. The record establishes no basis upon which to
set aside or modify the discipline in this case.
A W A R D
Claim denied.
NATIONAL RAILROAD ADJUSTMENT BOARD
By Order of Third Division
Attest:
10
Nancy J. r - Executive Secretary
Dated at Chicago, Illinois, this 18th day of May 1992.