The record on property demonstrates the following facts. The Carrier utilized Hyre Electric beginning on November 6, 1992 to dig a trench for an electrical conduit, attach cases to sides of signal houses, and to install and hook up wires, breaker boxes, breakers, transformers and a meter base. The work was performed by this outside contractor at Willow Springs, Illinois, and completed on November 17, 1992.
The Organization's claim is submitted on behalf of two signalmen for violation of the Scope Rule. In pursuing this claim the Organization argued that the equipment was an integral part of the signal system and furnished pictures of the work performed by the outside contractor.
As this claim progressed, the Organization further argued that the Carrier violated a Letter of Understanding dated November 2, 1992 with regard to meter poles and meter pedestals. The Understanding gave signal forces the work of performing "all trenching, laying of conduit" and cable with connections from the pole or pedestal to the original apparatus on Carrier's property. The Organization also noted that the work performed was exempt form local ordinance by the National Electric Code. As this work was performed on Carrier's property by outside contractors, it violated the Scope of the Agreement, the Letter of Understanding and was permissible by the employees under the National Code.
The Carrier denied the claim asserting that the work performed necessitated an outside contractor due to local codes adopted by the Village of Willow Springs. The Carrier argued that only electricians meeting local codes could perform the disputed work. In correspondence on property, the Carrier argued that it followed the same pattern of contracting out this work as it had at other named locations. Additionally, the National Electrical Code as well as the Letter of Understanding were neither germaine nor violated. In short, the Carrier holds to the central defense that the employees were not qualified under local government codes.
Reviewing only the materials presented and argued on property the Board concludes that the work performed was on Carrier property within the city limits of Willow Springs. After weighing the evidence to reach a determination on merits, the Board must deny the claim. This is due to the fact that this Board can find no denial of the Carrier's central defense, "that our signal employees do not meet the legal requirements to have performed the work in question." There is no rebuttal to this repeated assertion. Form 1 Award No. 31687
The Organization's assertion that the Code was inapplicable or that no license was required was responded to in denying the claim. The Organization was thereafter unable to establish substantial evidence for this Board to support the claim. Even if a license was unnecessary, the code requires examination and no evidence of employee qualifications was ever submitted. This decision is consistent with past decisions of this Board (Third Division Awards 12970, 12336, 10977).
This Board, after consideration of the dispute identified above, hereby orders that an award favorable to the Claimant(s) not be made.