STATEMENT OF CLAIM:
"Claim on behalf of the General Committee of the Brotherhood of
Railroad Signalmen on the CSX Transportation, Inc. (CSXT):
Claim on behalf of D. L. Love, E. W. Sell, 111, C. A. Hensley and M.
R. Hillman, for 40 hours each at their respective straight time rates
of pay, account Carrier violated the current Signalmen's
Agreement, particularly the Scope Rule, when it allowed outside
contractors to install a wheel impact detector at MPZ 125.3, on
November 12 through November 16, 2001, and deprived the
Claimants of the opportunity to perform this work. Carrier's File
No. 15(02-0051). General Chairman's File No. 12182001-1. BRS
File Case No. 12431-CLINCH."
FINDINGS:
The Third Division of the Adjustment Board, upon the whole record and all the
evidence, finds that:
The carrier or carriers and the employee or employees involved in this dispute
are respectively carrier and employee within the meaning of the Railway Labor Act,
as approved June 21, 1934.
Form 1 Award No. 37309
Page 2 Docket No. SG-37702
04-3-03-3-39
This Division of the Adjustment Board has jurisdiction over the dispute
involved herein.
Parties to said dispute were given due notice of hearing thereon.
The record demonstrates that a signal force was used to assist with the
installation of a wheel impact detector at Mile Post 125.3 during November 2001.
Specifically, during the week of November 12, 2001, contractors were used on the
project to install a "weigh in motion" sensory system within the wheel impact
detector. Thereafter, the "final cutover," or installation work, was performed by
Signal Department employees.
On December 18, 2001, the Organization submitted a claim in which it
asserted that ". . . the Scope Rule was violated when contractors finished the
installation of a wheel impact detector at MPZ 125.3." The claim requested that the
four individuals, noted supra, "be allowed forty hours each at the straight time
rate."
The Carrier's January 11, 2002 denial reads, in pertinent part, as follows:
"Contractors were utilized to install a highly complicated weigh in
motion sensor system, on the existing track structure. The
installation of this system requires skills, and tools, that were well
beyond the practical reach of the employees mentioned in your
claim. Tools like rail polishing tools, flash welding equipment,
precise measurement tooling, and etc. This work was done just after
the above mentioned employees were furloughed, and admittedly the
timing of that was not great, but the contractors did not finish the
DD installation. They merely installed the weigh in motion part that
had to be precisely flash welded to the rail, and tested their work
with the associated electronics inside the WILD DD housing. The
complete system wiring, download programming, testing, and
subsequent final cutover was work, which was performed by
personnel covered under the current BRS Clinchfield agreement."
Form 1 Award No. 37309
Page 3 Docket No. SG-37702
04-3-03-3-39
The claim was subsequently appealed by letter dated March 7, 2002, in which
the General Chairman asserted that ". . . the installation and testing of the weigh in
motion portion of the WILD DD is certainly within the ability of the signal craft"
In its final denial to the appeal dated May 1, 2002, the Carrier contended:
"A close inspection of the rule reveals it contains no mention of the
wheel impact detector cited in the claim. Moreover, the detector in
question is a highly complex weigh in motion device as well as an
impact detector. The employees you represent have never installed
this apparatus nor have they a contractual right to do so. Therefore,
it is the Carrier's position that it did not violate the Scope Rule of
the agreement when the equipment at issue was not installed by
members of the Organization."
The Organization asserts that the Carrier allowed an outside contractor to
perform work that accrues exclusively to employees of the signal craft, and in doing
so, violated the Scope Rule of the Agreement. The Scope Rule, however, is general
in nature and does not specify which work functions are exclusively within the
jurisdiction of the craft. Absent the specific mention of the work in dispute, the
burden of proof is on the petitioner to show a system-wide, exclusive right to such
work exists by custom, tradition, or practice. The record in this case is bereft of
such proof.
Moreover, although the Organization alleges that the ". . . Carrier used noncovered employees to finish the installation of the wheel impact detector . . . ." the
record demonstrates that the outside contractor installed the weigh-in-motion
sensory system within the wheel impact detector, after which members of the signal
craft performed the final cutover and any installation work necessary thereafter.
In that connection, although the Organization maintains that the Claimants were
"entitled" to the work and had performed "similar" installations, there is no
evidence on the record which supports that position.
Premised upon all of the foregoing, the claim must be denied.
Form 1 Award No. 37309
Page 4 Docket No. SG-37702
04-3-03-3-39
AWARD
Claim denied.
ORDER
This Board, after consideration of the dispute identified above, hereby orders
that an Award favorable to the Claimant(s) not be made.
NATIONAL RAILROAD ADJUSTMENT BOARD
By Order of Third Division
Dated at Chicago, Illinois, this 21st day of December 2004.