STATEMENT OF CLAIM:





FINDINGS:

The Third Division of the Adjustment Board, upon the whole record and all the evidence, finds that:
Form I Award No. 40092
Page 2 Docket No. MW-39393
09-3-NRAB-00003-060058
(06-3-58)

The carrier or carriers and the employee or employees involved in this dispute are respectively carrier and employee within the meaning of the Railway Labor Act, as approved June 21, 1934.


_ _~ Division of the Adjustment Board has jurisdiction over the dispute

involved herein.



Between December 2 and December 18, 2002, the Carrier assigned Manager B. Buss to operate a Bridge Inspection Vehicle (BIV) on the Menominee drawbridge at Mile Post 84.91 in the vicinity of Milwaukee, Wisconsin. The Organization filed the instant claim, alleging that Buss operated this piece of equipment to assist the Steel Bridge Crew in the performance of steel bridge modifications. The Organization argues that Buss is a management supervisor outside the scope of the Agreement and, therefore, he should not have been assigned work customarily and traditionally reserved to Maintenance of Way forces. The Organization stated during handling on the property: "On innumerable occasions the Carrier has brought down one of its own cranes to put up scaffolding and the System B&B Steel Crew then works off of the scaffolding." The Claimant, who performs Crane Operator work in connection with bridge and building maintenance and repair projects, should have been assigned to perform the work, the Organization asserts.


The Carrier argues that Buss is the operator of the Bridge Inspection Vehicle (BIV) and it has never been operated by Maintenance of Way forces. It further argues that Buss performed bridge inspection work which is not within the scope of the Agreement and any additional work which involved lifting persons or equipment was incidental thereto.


After careful review of the record in its entirety, the Board finds that the Organization failed to prove that the work falls outside the tasks permissibly performed by a management supervisor. On the contrary, the record established that Buss has been the only individual to operate this equipment since it was purchased by the Carrier and there is no evidence that any Maintenance of Way employee is trained or qualified to operate this piece of equipment.

Form I Award No. 40092
Page 3 Docket No. MW-39393
09-3-NRAB-00003-060058
(06-3-58)

To accept the Organization's position, the Board would necessarily have to rind that the Carrier was obligated to utilize a different piece of equipment as well as scaffolding to perform the work. No such conclusion is warranted. The Carrier determined that the work at issue, which involved inspection and the modification of knee braces on the inside of a through truss, required the use of the BIV. That is a matter within the Carrier's sound managerial discretion.


Based on the record presented, the Organization failed to meet its burden of proof. Absent evidence that the work belongs under the scope of the Agreement, the Board must rule to deny the claim.








This Board, after consideration of the dispute identified above, hereby orders that an Award favorable to the Claimants) not be made.



                    By Order of Third Division


Dated at Chicago, Illinois, this 19th day of November 2009.