Form 1 NATIONAL RAILROAD ADJUSTMENT BOARD

THIRD DIVISION

Award No. 44960 Docket No. MW-46764

23-3-NRAB-00003-210739

The Third Division consisted of the regular members and in addition Referee Kathryn A. VanDagens when award was rendered.


(Brotherhood of Maintenance of Way Employes Division – (IBT Rail Conference

PARTIES TO DISPUTE: (

(National Railroad Passenger Corporation (AMTRAK) (-other than Northeast Corridor


STATEMENT OF CLAIM:

“Claim of the System Committee of the Brotherhood that:


  1. The Carrier violated the Agreement when it allowed outside forces (RailPros) to perform Maintenance of Way work (flagging work) at or near the ‘Old Post Office’ located at approximately Mile Post

    467.59 in Chicago, Illinois beginning January 20, 2020 and continuing (Carrier’s File BMWE-158494-TC NRP).

  2. The Agreement was further violated when the Carrier failed to comply with advance notification and conference provisions in connection with the Carrier’s intent to contract out the subject work.


  3. As a consequence of the violations referred to in Parts (1) and/or (2) above, Claimants M. Moreno, J. Gleason, K. Green, M. Locicero, T. Judkins, L. Redmond, J. Gardner, J. Crespo, E. Augle, D. Fuentes, J. McNeilly, E. Flores, V. Williams, A. Matyszczuk, S. Lalinsky, A. Negrete and R. Mendoza shall now receive an equal and proportionate share for all hours (straight time and overtime) expended on the project by the outside contractor payable at the Claimants’ respective rates of pay.”


FINDINGS:

The Third Division of the Adjustment Board, upon the whole record and all the evidence, finds that:

The carrier or carriers and the employee or employees involved in this dispute are respectively carrier and employee within the meaning of the Railway Labor Act, as approved June 21, 1934.


This Division of the Adjustment Board has jurisdiction over the dispute involved herein.


Parties to said dispute were given due notice of hearing thereon.

The Claimants maintain seniority within the Carrier’s Maintenance of Way Department. For several months prior to the dates involved herein, the Carrier assigned its own Maintenance of Way Department forces to perform flagging work in connection with the Jones Lang LaSalle Americas (“JLL”) project involved in this dispute.


On July 26, 2019, the Carrier provided notice to the Organization:


As a courtesy, I am notifying you that Jones Lang LaSalle Americas has advised that it intends to enter into a contract with a qualified contractor to provide flagging protection services as necessary for its activities associated with structural repairs of the Old Post Office, effective August 12, 2019 for approximately one year. The Old Post Office is adjacent to Amtrak property at MP 467.59 in Chicago, IL. The work being completed by Jones Lang currently requires two flaggers five days a week for 8-hour shifts and every other weekend during 55-hour outages. Amtrak forces in Chicago are fully engaged in railroad projects and routine maintenance making it difficult for Amtrak to provide all flagging services for non-railroad projects such as this.

Even though Amtrak is not paying for or benefiting from the contractors discussed in this letter, l am notifying you of a contractor’s presence on the property.


The Organization requested a contracting conference and the parties conferenced on August 2, 2019, but reached no agreement. The Union requested a site visit and to discuss the matter further.


On November 1, 2019, the Carrier sent this notice to JLL:

Jones Lang LaSalle has an active Temporary Permit to Enter Upon Property (PTE) at the above listed location. Please be advised that Amtrak will soon cease its flagging services in connection with your PTE. To continue your work, you may make arrangements for flagging with an Amtrak approved flagging service. At this time, RailPros is the only Amtrak-approved flagging service, and can be reached as follows:

Sean Quigley

***

Please find attached a replacement PTE that accounts for flagging services to be provided by an Amtrak-approved flagging service. Please sign and return to me at the address below. Once you have made arrangements for flagging, please advise me of the start date of those services and Amtrak will sign and return your replacement PTE.

In December 2020, the parties discussed scheduling another contracting conference. Assistant to the General Chairman, Steven Stearn gave this statement,


Sometime during the first full week of January 2020, Ms. Clinton called me with the advisement that the project would now go forward using BMWED employees for the protection portion. Ms. Clinton advised that the contractor working on the Old Post Office was ready to go and the 3rd party contractor protection forces were not. Ms. Clinton said she would send me something advising that Amtrak’s notice would be rescinded.

On January 20, 2020, the Carrier removed the flagging work from Maintenance of Way Department forces. From that point forward, RailPros, an outside contractor, performed all aspects of the disputed flagging work at or near the “Old Post Office” located at approximately Mile Post 467.59 in Chicago, Illinois.

In a letter dated February 19, 2020, the Organization filed a claim on behalf of the Claimants. The Carrier denied the claim in a letter dated April 13, 2020. Following discussion of this dispute in conference, the positions of the parties remained unchanged, and this dispute is now properly before the Board for adjudication.


The Organization contends that it has presented a prima facie claim of the Carrier’s violation of the Agreement. The Organization contends that it has presented evidence that the Scope-protected work took place as alleged. The Organization contends that there is no question that providing flagging/track protection is typical Maintenance of Way work. The Organization contends that such work has customarily

and traditionally been assigned to and performed by the Carrier’s Maintenance of Way forces and is contractually reserved under the Agreement.


The Organization contends that when the Carrier plans to contract out work within the scope of the Agreement, it must give the General Chairman at least fifteen days’ advance written notice of its plans to contract out the work and if requested, meet with the Organization, as required by Rule 24 of the Agreement.


The Organization contends that there is no question that on-track protection (flagging) is Scope-protected work. Third Division Awards 26777, 28180, 34181, 37003, 43919, and Award 8 of Public Law Board 6054. In fact, the Organization points out that the Carrier assigned its own Maintenance of Way Department forces to perform this very work for several months prior to the events that gave rise to this dispute. The Organization contends that while other crafts have provided flagging work, it is in conjunction with its own work.

The Organization contends that the Carrier’s refusal to comply with the provision of Rule 24 requires a sustaining award. The Organization contends that the Carrier failed to comply with the advance notification and conference provisions, in good faith, in an attempt to reach an understanding between the parties concerning it.


The Organization contends that the Carrier maintained control over how and by whom the subject work was going to be performed. The Organization contends that the Carrier instigated the work, arranged for the work, received the benefit of the work, and paid for the work, thus the work falls under the Scope of the Agreement. The Organization contends that the Carrier failed to offer any evidence which could allow a reasonable mind to conclude that the Carrier did not control, instigate, benefit or pay for the work. The Organization contends that the Carrier has failed to provide any documentation to support its affirmative defense that JLL, and not the Carrier, has control over the contractors.


The Organization contends that Award 1 of PLB 7705, which involves flagging disputes between the BMWED and the Union Pacific (MOP Agreement), relied on by the Carrier, is distinguishable from the instant matter, because here the Carrier has maintained control over the claimed work. The Carrier trained and required RailPros to provide flagging protection for a third-party project occurring on its property. More recent arbitral authority from the same MOP Agreement found that the Carrier still controlled the work, even when a third party was paying the outside contractor.

The Carrier contends that the Organization has failed to show a violation of the Agreement. The Carrier contends that the Organization is claiming work that does not belong to its members. The Carrier contends that the work is part of JLL’s structural repairs at Chicago’s Old Post Office, which is adjacent to the Carrier’s property. JLL, on behalf of the property owner, contracted out, paid for, controlled, and received the benefit of this work, which is to ultimately maintain the building’s structural integrity.


The Carrier contends that the work is not for its benefit and is only involved to ensure that the outside entity coming onto its property is safe. The Carrier contends that it did not contract out this work. Under the third-party doctrine, set forth in Award 1 of PLB 7705, if a carrier does not arrange, control, pay for, and receive the primary benefit from the work, it is not Scope-covered work. Here, the Carrier did none of those as the work was for a JLL project.

Even though it was not required to do so, the Carrier provided notice and an opportunity to discuss when requested as a courtesy, and also met all procedural requirements throughout the handling of this matter. The notice indicated that it would not be feasible to provide flagging services for this non-railroad project.

The Carrier contends that the Organization has failed to prove that the Carrier contracted out Scope-covered work. The Carrier did not contract the work. Nobody was furloughed as a result of this project. Thus, Rule 24 did not apply.


The Carrier contends that JLL, not the Carrier, approached RailPros and arranged the terms of its flagging work at the Old Post Office, decided the project would go forward, told RailPros when to work, and paid RailPros for their work. The Carrier contends that its November 1, 2019 letter does not demonstrate control over the project.


Finally, the Carrier takes issue with the Organization’s requested remedy. The Organization has failed to show how any of the Claimants were harmed by the alleged contracting out. Each Claimant was fully engaged in work for the Carrier during the period of the instant claim. No employee was furloughed or suffered a loss of compensation.

The claim before this Board concerns flagging work initially performed by MOW forces and later by RailPros contractors. This is hardly a case of first impression. Because the flagging work was done in conjunction with JLL’s project, the parties framed their arguments using the third-party doctrine discussed in Award 1 of Public Law Board 7705. It set forth a set of factors to consider when determining whether

work is related to railroad operations, and therefore, Scope-covered work. The board defined the criteria, as follows:


  1. Where the work, while perhaps within the control of the Carrier, is totally unrelated to railroad operations.

  2. Where the work is for the ultimate benefit of others, is made necessary by the impact of the operation of others on the Carrier’s property and is undertaken at the sole expense of that other party.

  3. Where the Carrier has no control over the work for reasons unrelated to having itself contracted out the work.


In that case, the board applied the factors and found that the carrier did not have control over the claimed work because a third party compensated the contractors for the work and benefited from the work. The Carrier urges this Board to apply this holding to this case, arguing that JLL contracted with and paid RailPros for its own benefit.


Conversely, the Organization asserts that Award 1 has been clarified over the years in subsequent decisions and encourages this Board to follow those decisions, specifically, Awards 1, 2 and 4 of Special Board of Adjustment BMWED-UP Flagging Arbitration Board (Missouri Pacific Agreement) as well as Awards 2, 3 and 4 of Special Board of Adjustment BMWED-UP Flagging Arbitration Board (Union Pacific Agreement and former Chicago and Northwestern Transportation Agreement). According to the Organization, these later awards provide much greater insight into the third-party doctrine than Award 1 of Public Law Board 7705.


In Award 3 of the SBA, the board wrote, “When a third party determines who will provide those services, the identity of the service provider, be it RailPros, Carrier or any other entity, is outside Carrier’s control and, even though the services are performed on Carrier’s property, the work falls outside the scope of the Agreement.” In that case, however, the claim was sustained because the board found that it was the Carrier who decided that RailPros would provide the flagging, writing, “Where Carrier controls the work that is to be performed on Carrier’s property, the Agreement applies and the claim must be sustained.” It went on,


Carrier did more than simply require the third party to secure flagging services, leaving it to the third party to decide who would provide those services. Carrier did more than suggest sources of those services to the third party. Carrier did more than exercise its reasonable right provided

under the right of entry agreement to approve the third party’s selection of the flagging service provider. Carrier dictated who would perform the flagging work on Carrier’s property. That the third party directly paid the outside contractor for the work does not change the basic fact that Carrier controlled the work performed on Carrier’s property, thereby bringing it under the coverage of the Agreement.


In the case at bar, it is clear that the Carrier similarly told JLL that it could not continue its project on the Carrier’s property, unless it used RailPros for flagging. Just as in the cited case, the Carrier left no other choice to JLL, other than to discontinue its work. The Carrier also made clear that it would not issue the PTE until arrangements with RailPros had been made. Finally, the Carrier advised in the PTE that it would provide training to the contractors. Therefore, the Board concludes that the Carrier controlled the work performed by the RailPros contractors on its property.

The Carrier also argues that it complied with the Notice and contracting provisions in Rule 24, by providing a courtesy notice to the Organization and by meeting to discuss the contracting. However, the Organization presented unrefuted evidence that while the parties were still discussing the contracting out, the Carrier rescinded the notice and indicated that JLL would again use MOW forces for flagging at the Old Post office. Thus, the record does not support a finding that the Carrier complied with Rule 24.

AWARD

Claim sustained.


ORDER

This Board, after consideration of the dispute identified above, hereby orders that an award favorable to the Claimant(s) be made. The Carrier is ordered to make the Award effective on or before 30 days following the postmark date the Award is transmitted to the parties.


NATIONAL RAILROAD ADJUSTMENT BOARD

By Order of Third Division Dated at Chicago, Illinois, this 24th day of May 2023.


NATIONAL RAILROAD ADJUSTMENT BOARD THIRD DIVISION


INTERPRETATION NO. 1 TO AWARD NO. 44960

DOCKET NO. 46764 OLD NRAB Case No. 3-210739 NEW NRAB Case No. 3-240361


(Brotherhood of Maintenance of Way (Employes Division – IBT Rail Conference

PARTIES TO DISPUTE: (

(National Railroad Passenger Corporation (AMTRAK)(-other than Northeast Corridor


STATEMENT OF CLAIM:

Claim of the System Committee of the Brotherhood that:


(3) As a consequence of the violations referred to in Parts (1) and/or (2) above, Claimants M. Moreno, J. Gleason, K. Green, M. Locicero,

T. Judkins, L. Redmond, J. Gardner, J. Crespo, E. Augle, D. Fuentes, J. McNeilly, E. Flores, V. Williams, A. Matyszczuk, S. Lalinsky, A. Negrete and R. Mendoza shall now receive an equal and proportionate share for all hours (straight time and overtime) expended on the project by the outside contractor payable at the Claimants’ respective rates of pay.”

This claim was sustained in full. However, a dispute has risen over the interpretation of Award 44960 because the Carrier has failed to properly compensate the Claimants. Specifically, the Carrier has unilaterally taken it upon itself to stop the liability during the middle of the claim period based on an alleged notice that was not part of the record before the Board.


BMWED requests an interpretation to the award in order for the Third Division to clarify the proper remedy to be applied therein.


INTERPRETATION OF AWARD:

On May 24, 2023, the Third Division adopted Award 44960, NRAB Docket No. MW-46764, which concludes:

In the case at bar, it is clear that the Carrier similarly told JLL that it could not continue its project on the Carrier’s property, unless it used RailPros for flagging. Just as in the cited case, the Carrier left no other choice to JLL, other than to discontinue its work. The Carrier also made clear that it would not issue the PTE until arrangements with RailPros had been made. Finally, the Carrier advised in the PTE that it would provide training to the contractors. Therefore, the Board concludes that the Carrier controlled the work performed by the RailPros contractors on its property.


The Carrier also argues that it complied with the Notice and contracting provisions in Rule 24, by providing a courtesy notice to the Organization and by meeting to discuss the contracting. However, the Organization presented unrefuted evidence that while the parties were still discussing the contracting out, the Carrier rescinded the notice and indicated that JLL would again use MOW forces for flagging at the Old Post office. Thus, the record does not support a finding that the Carrier complied with Rule 24.


After the Board’s adoption of Award 44960, the Carrier and the Organization set about determining the remedy that was to be paid to the Claimants. During its discussions with the Organization, the Carrier indicated that it believed that its liability to the Claimants did not extend past December 2022, when the Carrier served a contracting notice on the Organization which it suggested covered the work being done at the Old Post Office location. Thereafter, the Carrier asserted that, based on the discovery of a July 2021 notice to the Organization, its liability did not extend beyond the July 2021 notice. The Carrier took the position that the initial contracting violation was rectified by the provision of an ostensibly proper notice in July 2021. The Organization disagreed with the Carrier’s position, arguing that the initial claim sought compensation beginning January 20, 2020 and continuing for all hours expended on the project by an outside contractor, and that the Carrier’s initial violation could not be retroactively cured.


The Carrier paid the Claimants in accordance with its interpretation that its liability for failure to serve a proper notice ended at the point when it provided a contracting notice in July 2021. In the meanwhile, the Organization filed this request for an interpretation.

The parties’ controlling Agreement provides, at Rule 24, in relevant part: RULE 24 - CONTRACTING OUT

  1. In the event the Carrier plans to contract out work within the scope of the schedule agreement, the Chief Engineer shall notify the General chairman in writing as far in advance of the date of the contracting transaction as is practicable and in any event not less than 15 days prior thereto.

  2. If the General Chairman requests a meeting to discuss matters relating to the said contracting transaction, the Chief Engineer or his representative shall promptly meet with him for that purpose. The Chief Engineer or his representative and the General Chairman or his representative shall make a good faith attempt to reach an understanding concerning said contracting, but if no understanding is reached the Chief Engineer may nevertheless proceed with said contracting, and the General Chairman may file and progress claims in connection therewith…


Rule 24 requires that in the event the Carrier plans to contract out Scope-covered work, it must notify the General Chairman in writing “as far in advance of the date of the contracting transaction as is practicable and in any event not less than 15 days prior thereto.” In Award 44960, the Third Division held that the Carrier failed to act in compliance with this provision when it began a contracting transaction in January 2020 without providing adequate advance notice to the Organization.


The triggering event in such a case is the date upon which the contracting transaction began without having provided proper advance notice. In Award 28918, the Third Division construed Rule 24 and held that a claim protesting contracting out without providing proper advance notice was untimely when filed more than 60 days


after the contracting transaction began because such a claim is not a continuing claim, even when there is continuing liability:


While the claim presently before us may have had potential continuing liability, it is one which had as its basis an alleged violation which occurred on a date certain; that is, the date the Carrier subcontracted out the disputed work without notifying the Organization. The Organization had sixty days from that initial triggering event to file a claim, and did not do so. The claim, therefore, must be dismissed on that basis.

Similarly, the Organization’s claim here sought compensation for a contract violation which occurred on a single date: the day that the contracting transaction began without having provided advance notice to the Organization. The term is clear and unambiguous: notice must be given to the Organization before the contracting transaction begins. Once the violation occurred, there was no way to go back and “cure” the violation. Notice given after the contracting transaction will not undo the harm caused by the failure to give the Organization advanced notice and an opportunity to meet and discuss the transaction before it begins. The intent of the language is to provide an opportunity for meaningful discussion before the contracting transaction begins. Undoubtedly, once the contractors began performing the members’ work, any attempts to reach an understanding concerning said contracting would be made more difficult.


The Carrier cited numerous Awards addressing the right of the Carrier to contract out even Scope-covered work. There is no question that when the Carrier meets its obligation to provide “timely advance notice” and an opportunity for good faith discussions with the Organization, Rule 24 permits the contracting out of work. See, e.g., Third Division Award 40233, quoting Third Division Award 38195. Here, the Carrier was found not to have provided timely advance notice, and thus, the contracting transaction was improper for the entirety of the transaction.

Both parties cite a number of Awards affirming the well-settled principle that due to the Board’s appellate jurisdiction, we are precluded from considering evidence or argument that was not presented during the on-property correspondence. For this reason, the Organization urges us to ignore the Carrier’s argument that its liability should end once it provided a proper contracting notice, as this argument was never


raised during the initial claim processing. This Board agrees that it cannot make a determination that the Carrier’s July 2021 notice was proper or timely, as the defense was never raised during the processing of the initial claim.

The Carrier similarly argues that the Organization never previously argued that the Carrier’s liability should extend past the July 2021 notice. Of course, the first time that the Organization was aware that the Carrier was asserting that its liability was ended by the July 2021 notice was after the issuance of Award 44960 on May 24, 2023, sustaining its continuing claim in full. There was no basis for the Organization to make this argument previously, as it only relates to the proper remedy to be paid after the sustaining Award issued.

There is no question that the Organization filed a claim seeking compensation “beginning January 20, 2020 and continuing” for its affected members “for all hours (straight time and overtime) expended on the project.” In contrast, the Third Division Award 45054 defined a “continuing claim by quoting from First Division Award 29768 [quoting Second Division Award 13682]:


Alleged “continuing” violations of the Agreement (as opposed to a single isolated and completed transaction) lead to “continuing” claims because the act complained of is repeated from day to day. Every day an alleged violation continues results in a new “occurrence”.

In Third Division Award 45054, the Board found that when the Carrier realized it had failed to timely disallow a claim and paid the claim up to the date of its late denial, the claim for continuing compensation had not been paid in full. The Board found that the Carrier could not “avoid the consequences of a continuing claim by paying a portion of [the] claim that is specified as of the commencement date of a continuing claim.” There, the Board ordered the Carrier to reimburse those claimants for any “expenses they incurred… until the Carrier begins to make the required payments.” In other words, liability continued until the violation ceased and the claim was fully remedied; it did not end when the Carrier realized its error and provided its untimely disallowance.

Here, the project was not ended when the Carrier provided a later notice to the Organization. It continued beyond that day, and on each day of the project and until the project ended, the Organization’s members’ work was improperly performed by


contractors. The Organization clearly placed the Carrier on notice that it was seeking compensation for each day of the project until the contracting transaction was ended. Assuming without deciding that the Carrier provided a proper contracting notice after the fact, it would not cure the violation that occurred upon the commencement of the contracting transaction and continued until the project was ended. The Carrier must compensate the Claimants for all hours expended on the entire project by the outside contractors.

Referee Kathryn A. VanDagens who sat with the Division as a neutral member when Award 44960 was adopted, also participated with the Division in making this Interpretation.

NATIONAL RAILROAD ADJUSTMENT BOARD

By Order of Third Division Dated at Chicago, Illinois, this 20th day of March 2026.

INTERPRETATION No. 1

to

THIRD DIVISION AWARD 44960 DOCKET MW-46764

(Referee Kathryn A. VanDagens)


The Carrier must dissent to this Board’s findings in the above-referenced interpretation award. This matter involves an interpretation of the appropriate remedy under Award No. 44960. In that award, this Board sustained a contracting out claim because it found that the work was scope-covered and the Carrier did not comply with the notice requirement in the Agreement between the parties. There was no set of facts before the Board alleging a contracting out violation after a proper notice was provided in July 2021, approximately a year and half after the claim was filed.


It is inappropriate to provide a remedy for a period of time when there was a proper notice for this project because that is not what the Organization claimed nor what the Board originally considered. Arbitration authority supports the well-established principle that an issue not developed on the property is not ripe for resolution at the arbitration level. See, e.g., NRAB-1/Award No. 26279 and NRAB-3/Award No. 29731 and 35706 (which specifically lays out that a board cannot decide a remedy for a period involving a factual change not before it). Even when the Organization presents a new question during the on-property appeal process, it is too late to be considered since it was not introduced in the initial claim. See, e.g., NRAB-2/Award No. 9909 and NRAB-3/Award No. 24470, 36020, and 43799. Therefore, it stands to reason that when a question has not been considered at any stage of handling, a board has no ability to make a ruling on that question. Doing so here was in error. Importantly, the Carrier could not even have presented the fact of the July 2021 notice in this matter under well-established arbitration authority. The July 2021 notice was issued after the Organization submitted this case to arbitration. Parties are not permitted to submit evidence that was not presented during on-property handling. See, e.g., NRAB-3/Award Nos. 24506, 30673, 31381, and 44626.

The Carrier must also dissent to the interpretation’s language that forecloses the concept of curing a violation when there is ongoing liability. The award states that “[t]he triggering event in such a case is the date upon which the contracting transaction began without having provided proper advance notice…Once the violation occurred, there was no way to go back and ‘cure’ the violation…Assuming without deciding that the Carrier provided a proper contracting notice after the fact, it would not cure the violation that occurred upon the commencement of the contracting transaction and continued until the project was ended.” It is illogical and inequitable to require a carrier to continue to incur liability without the opportunity to cure the violation and toll the liability. Moreover, such an outcome is counter to the many arbitration awards that craft equitable remedies. Boards routinely support

Carrier Members’ Dissent to Interpretation No. 1 to

Award 44960; Docket MW-46764 Page 2


remedies that take into account yet-unknown factual changes that cure a violation. See, e.g., NRAB-2/Award No. 12443 and NRAB-3/Award No. 33444 and 38099.


Therefore, this Board’s decision is erroneous. For these reasons, the Carrier respectfully dissents.


Madeleine Respler Jeanie L. Barrere


Madeleine Respler Jeanie L. Barrere

Carrier Member Carrier Member