PROCEEDINGS BEFORE PUBLIC LAW BOARD NO. 3781

AWARD NO. 64

Case No. 64

Referee Fred Blackwell

Carrier Member: J. H. Burton

PARTIES TO DISPI

Labor Member: K. R. Mason

BROTHERHOOD OF MAINTENANCE OF WAY EMPLOYEES

CONSOLIDATED RAIL CORPORATION

STATEMENT OF CLAIM:

Claim of the System Committee of the Brotherhood that:

1. The Carrier violated the Agreement when it assigned an outside concern to perform bridge undercutting work between Framingham, Massachusetts and Chatham Center, New York beginning July 30, 1987 and continuing (System Dockets CR-3498, CR-3628, CR-3998, CR-4171 and CR-4172).


2. The Carrier violated the Agreement when it assigned an outside concern to perform right of way ditching, hauling of fill material and installation of drain pipes between Framingham, Massachusetts and Chatham Center, New York beginning June 1, 1988 and continuing (System Dockets MW-205, MW-206 and MW-207).


3. As a consequence of the violation referred to in Part (1) hereof (System Docket CR3498), Track Foreman W. Cummings, Machine Operators C. Pappas, C. Laffond, J. P. O'Conner, Vehicle Operators T. Pais, D. Stumborg, R. Mercure, M. Damours, C. Harrison, M. Phelan, Trackmen D. Ravizaa, T. Evans and J. Donley shall each be allowed pay at their respective rates of pay for all hours worked by the contractor's forces beginning July 30, 1987 and continuing.


4. As a consequence of the violation referred to in Part (1) hereof (System Docket CR3628), Track Foreman M. Callahan, Machine Operators G. McMullen, D. Tolomeo, J. P. O'Conner, J. J. O'Conner, A. McMenamin, Vehicle Operators T. Pais, D. Stumborg, C. Sorensen, M. Camours, Trackmen V. Okskin and S. Ellis shall each be allowed pay at their respective rates of pay for all hours worked by the contractor's forces between September













FRED BLXKWM
ATM EY AT UN Upon the whole record and all the evidence, after November 8, 1990 hecuing in

19129 ROMAN WkY

GADHEHSBUK

MARYLAND 20979

(301/ 977fi0D0











FRED BLACKWEU.
MppREY AT LM express, explicate text of the Scope of the BMWE Agreement, and that the Carrier violated

19129 ROMAN NAY

GAITHERSBURG,

MARYLAND 20879

(9011 9n-soon






1
FRED BLACKWELL All prior authorities submitted for the record have been considered and analyzed in
ATTORNEY AT L4V arriving at this decision.
19129 ROMAN WAY
DAITNaiSBURG, 4
MARYLAND 29879
(301( 9775090



FRED HLACKWELL
ATTORNEY A1 LAW
18129 siOM MY
GA~NMSBUHG, 5
MARYLAND 20879
(301) BTl30W


Fred Blackwell

Chairman / Neutral Member

Public Law Board No. 3781


April 12, 1994

FRED BLACKWELL ATTORNEY AT LAW

19729 ROMAN MY

MARYLAND 29979
6 poll w4oao



      The claims are hereby denied for lack of the requisite record support. BY ORDER OF PUBLIC LAW BOARD NO. 3781.


                  Fred Blackwell, Neutral Member


    AH. Burton, Carrier Member 4~-~ Labor Me mb


Executed on ca · ~ -9 S


CONRAIL\3781\64-64.412

FRED BLACKWELL
ATTORNEY AT LAY
19129 ROMAN YIAY
GAITHERSBORG, 7
MARYLAND 20879
(301) 977-5000

                                                37-&V


June 4, 1987

Mr. J. P. Cassese, Sr., General Chairman Brotherhood of Maintenance of
    Way Employes

IIGS Marlkress Road, Suite 8
Cherry Hill, NJ 08003

    File 079.50-56


Dear Sirs

This is to advise that we have undertaken an extensive clearance project from Framingham, Mass. to Chatham Center, New York to provide a 19'-4" vertical clearance along the Boston Line from 1..P
1.00 to MP 183.00 in order to permit 19' multi-level traffic. To accomplish this work, we will require contract forces for excavation, drainage, rock removal and installation of ballast at the following locations:

    STRUCTURE LOCATION

    *T50.25 "- Nort t _ Pittsfield, MA

    *150.09 First St., Pittsfield, MA

    *149.93 Second St., Pittsfield, MA

    148.18 Junction Rd., N. Adams Jct., MA

    90.74 Old Boston Rd., Ludlow Jet., MA

    74.84 South St., W. Warren, MA

    70.66 warren St., Warren, MA

    47.30 Curtis Pkwy., Worcester, MA

    *96.30 Exeter St., Worcester, MA

    *46.23 Cambridge St., Worcester, MA

    *45.89 Gates St., Worcester, MA

    *41.67 Hamilton St., Worcester, MA

    22.35 winter St., Framingham, MA


    * - Scheduled for the 1987 Work Season


The contracted work is estimated to be $2,258,350 and is scheduled to be done between July 1987 to December 1988.

_~X_HIBIT 9


'Appendix Page 1

                                                  3701


;. P. Cassese ?age 2 J,;ne 4, 198?

Conrail does not have the rock drilling and rock splitting equipnent that may be required to perform rock excavation at the above locations. our forces will perform all track removal and installation work.

Solely as information, there will be structural work done by a contractor during the above period to raise 30 government bridgr. that Conrail does not own or maintain.

Very truly yours,

/s/ G. F. Bent f"f17

T~ F

G. F. Bent
Senior Director-Labor Relations

EXHIBIT I

`