PUBLIC LAW BOARD N0. 4340 -
Joseph Lazar, Referee
AWARD N0. 11
CASE N0. 11 -
s
PARTIES ) - BROTHERHOOD OF MAINTENANCE OF WAY EMPLOYES -
TO ) -vs
DISPUTE ) BURLINGTON NORTHERN RAILROAD COMPANY
STATEMENT - - , , ~- _ , ._ . . _~-_. v
s . _ _ . .
OF CLAITI: Claim of Mantel Griggs who was dismissed from the Carrier's
service from December 2, 1986, and reinstated, with trackman
seniority only, on January 14, 1987. Claim is for payment
for all time lost including reinstatement of his foreman =
seniority.
FINDINGS:- _ The
Board, on consideration of the whole record and -
all the evidence, finds that the parties herein are --°
Carrier and Employee within the meaning of the Railway Labor Act, as
amended, that this Board is duly constituted by Agreement dated April
lD, 1987,
that it has jurisdiction of the parties and the subject
matter, and that, pursuant to the Agreement dated April 10,
1987,
oral hearing by the parties, including Claimant, has been duly waived
Under date of January 14, 1987, Claimant Mantel Griggs received the
following letter:
"This is to advise that as the result of the investigation conducted in Memphis,
Tennessee on January 6, 1987 by General Roadmaster R. P. Wiese, you are hereby
reinstated to the position of trackman on Seniority District No. 6 (Class I in
the Track Sub-department as defined in Rule 5 of the August 1, 1975 working agreement) subject to you passing a re-entry physical examination given by a company
physician, but without any Class 4 seniority as was previously established under
Rule 1 of the agreement. All other rights you have established under the Aug. 1,
1975 agreement remain intact; howeber, your reinstatement does not include any
payment for time lost because of your suspension by Roadmaster Lang on December
2, 1986.
"Said investigation showed clear violation of Rules 70(a) and 70 (b) of the Burlington Northern Rules of the Maintenance of Way effective April 27, 1986 in connection with the on track machines under your direct supervision nearly colliding -
with Norfolk Southern Train 552 on Dec. 1, 1986 at Jasper, Alabama."
AWARD N0. 11 (p. 2)
CASE N0. 11
Rule 70 (a) reads:
"When a signal at an Autopnatic Interlocking displays a red aspect,
on track equipment that shunts the track must stop before passing
the signal and remain there while employee in charge operates the
time release according to the instructions posted in the release box.
If the signal indicates proceed after the instructions complied with,
movement may pass the signal and move over the crossing. If the signal does not clear, movement beyond signal and over crossing must not
be made until the employee at the crossing is sure there is no train
or engine movements approaching on any route and a proceed hand signal is received."
Rule 70 b reads:-
"When
"When a signal at a manual interlocking displays a red aspect, on _
track equipment that shunts the track must stop before passing the
red signal. The employee in charge of the machine must communicate
with the Control Operator and be governed by his instructions. If
communications have failed, movement through the interlocking may
only be made after lining all switches for the route to be used and
the machine that occupies the track within the interlocking limits but
clear of any conflicting routes for a period of ten minutes."
The transcript of investigation shows the following testimony by Roadmaster L.
B.
Lang:
"Q. Alright. Did an incident occur on December 1, or was an incident brought to
your attention?
A. Yes, it was.
Q. By
whom?
A.
By
the Road Foreman for the Southern.
Q.
Would that be the Norfolk and Southern? -
A. Norforlk Southern, yes.
Q. Norfolk Southern Railroad. Could you describe to me what happened?
A. He came - I was in the Tool House at Jasper, out behind the Depot, and he
came out there and said that he wanted to talk to the Foreman, whoever was
in charge of the Gang out there, and I asked him what the trouble was. He
didn't know who I was, and I didn't know who he was. He told me that one of
the machines had just about been hit at the railroad crossing there at the -
Interlocker at Jasper. Of course I told him who I was and he told me who he
was, and that's basically how I found out about it.
Well, what did he say happened? - -
A. He said that the Southern Train came around there, and when they got into the
AWARD N0. 11 (p. 3)
CASE N0. 11
the interlocking limits they had a clear signal and then before they got
to the Approach Signal it went red and cleared right back up in their face.
They came around there, and about the-time they got. to the Signal-at the
Interlocker itself it went red, and of course they were right on it. He
said when they went by - there's a little curve there - he said they saw the
ballast regulator about 3 or 4 foot from the railroad crossing.
Q. Alright, subsequent to this visit, did you request this gentleman to give
you a statement of what he told you?
A. Yes sir.
Q. And did he give you such a statement?
A. Yes he did. --
Q. Is that the statement the gentleman gave you?
A. Yes sir, it's a statement from D. G. Orazine, the Road Foreman of Engines
for the Norfolk Southern Railroad, and it's notarized.
Q. Would you, for the record, read it.
A. It's dated December 11, 1986. It
says:
To Whom It May Concern:
On December 1, 1986, approximately 9:25 AM Southern Train 552, eastbound at
Jasper, Alabama, Mile Post 86.4 NA, nearly struck BN track equipment at BN
Interchange, Jasper, Alabama.
No. 552 reported near miss with two BN track machines. Engineer reported
1st Machine 05-0052 (Double Broom) had crossed in front of engine and was
missed only five (5) feet by train. Another machine BNX 6-0228 Regulator
was north of Southern main line within interlocking limits. No. 552 had
clear signal at Jasper.
Road Foreman of Engines D. J. Orazine arrived on scene shortly after incident
and talked to Roadmaster Bruce Lane about incident. Both called Machine Operators Bob Highfill of 05-0052 and Jimmy Young of BNX 6-0228 into office and
found that no one had operated time release on interlocking at Jasper. Operator Highfill stated he heard approaching train and then crossed interlocking
in front of Southern Train. Operator Young heard train but stopped north of
Southern main line as train was three (3) car lengths from crossing.
No BN track people had attempted to operate time release to set signals against
Southern trains. Tape from interlocking machine shows:
42
~(p-It
AWARD N0. 11 (p. 4)
CASE N0. 11 -
9:lfi AM Southern approach occupied by Southern Train No. 552.
9:24 AM BN interlocking occupied momentarily then cleared for Southern train.
9:26 AM Southern Train occupied interlocking on clear signal.
9:26 10/AM BN O.S. Circuit occupied by BN track machine.
9:27 AM Southern Approach cleared. -
9:30 AM Southern cleared interlocking.
9:33 AM BN O.S. Circuit cleared." ****
The transcript of investigation shows the following testimony of Assistant
Foreman Joe N. McCluskey:
"Q. Alright. Uh, did you, uh, tell Mr. Griggs about having to run the Interlocker -
run the release on the Interlocker?
A. Yes sir, I-told him we needed to run a release on it or flag the crossing, and
when we started to work off of it, we needed to make arrangements with the
Southern Railroad to get some Track and Time so we can start surfacing aff our
interlocker there. -
Q. Did all this take place prior to December 1?
A. Yes sir.
****
Q. OK. You told Mr. Mantel that Roadmaster and Mr. Buzbee wanted you to be
aware and concerned that you go through the proper procedures to get through
the Interlocker. Is that correct?
A. Right." (Tr., pp. 37-38).
The transcript of investigation shows the following testimony of Claimant Mantel-
Griggs:
"Q. You know what procedures to follow?
A. Yes.
Q. And what procedures are those?
A. Well, you get Track and Time and if you want to go across the crossing you're
supposed to run a release on it, and flag the machines on across."
****
Q. Did you at any time take the extra step to inform your Operators on the procedures of getting across the crossing?
A. No, I didn't take the extra step to tell them. Everybody knew that the crossing
- the Interlocker was there.
Q. Everybody knew it, but you never did personally tell the Operators to run the
release.
A. No, me or Joe one would just be at the crossing and flag it.
****
~3~Io-11
AWARD N0. 11(p. 5)
CASE N0. 11
Q. So am I saying this correct then? Not every time that you went across the
crossing did you run the release. Am.I saying that correct?
A. Yes. No, we didn't run the release every time.
Q. You didn't run the release, you just "flagged them across". Is that correct?
A. Right.
Q. At any time did you run the release?
A. I didn't, no.
Q. Did Mr. McCluskey run the release, to your knowledge?
A. Uh, I don't know." (Tr., pp. 43-44).
"Q. Do the machines on your Gang shunt the track? Throw the signals?
A. Yes, we have, I think, two Regulators do.
Q. But at no time you were running the release on the Interlocker at Jasper,
Alabama?
A. No, we always just flagged them across.
Q. Isn't that a rule violation?
A. Well, I guess due to the Rule Book it is.
Q. You know, in view of this near miss we had with the Norfolk Southern Train
552 on December 1, if you had to go through an Interlocker now, how would you
go through the Interlocker?
A. Well, I'd run the release on it and make sure it's clear both ways before
moving across it." (Tr., pp. 47-48).
The evidence of record clearly establishes that Claimant received verbal-instruction to run the release on the Interlocker, knew the location of the machines
on his gang and the location of his Assistant Foreman, had not informed his Operators -
of the proper procedures to get through the Interlocker, did not run the release on
the Interlocker, and admitted that he violated the rules. The record shows substantial probative evidence to support the Carrier's determination that Claimant violated Rules 70(a) and 70 (b) of the Burlington Northern Rules of the Maintenance of
Way. Considering the gravity of the violation with possible death and injury to
members of Claimant's gang, and considering the failure of Claimant to understand the _
seriousness of his violation ("Cause I feel that I was tooken out of service for
nothing, really." (It., p. 52), Claimant's discipline was not excessive.
q3q D-iI
AWARD NO. 11 (p. 6)
CASE NO. 11
A W A R D
1. The Carrier is not in violation of the Agreement.
2. The claim is denied.
JOSEPH AZARL , CHAIRMAN AND NEUTRAL MEMEER
DATED:
Ice-.--._
i Y 1?87
q3qD-II