PUBLIC LAW BOARD NO. 5938
BROTHERHOOD OF MAINTENANCE OF WAY EMPLOYES )
Case No. 1
and )
Award No. 1
CONSOLIDATED RAIL CORPORATION )
Martin H. Malin, Chairman & Neutral Member
S.V. Powers, Employee Member
J. H. Burton, Carrier Member
Hearing Date: May 19, 1997
STATEMENT OF CLAIM: "Claim of the System Committee of the
Brotherhood that:
1. The Agreement was violated when the Carrier assigned an
outside contractor (Hilltop Paving) to perform grade
crossing paving work on the road crossing at Mile Post
199.1 on Thursday, June 23, 1994 (System Docket MW
3774).
2. The Agreement was violated when the Carrier assigned an
outside contractor (Hilltop Paving) to perform grade
crossing paving work on the road crossing at Mile Posts
166.4 and 169.4 on Monday, September 12, 1994 (System
Docket MW-3775).
3. The-Agreement was violated when the Carrier assigned an
outside contractor (Hilltop Paving) to perform grade
crossing paving work on the road crossing at Mile Post
170.9 on Wednesday, September 14, 1994 (System Docket
MW-3776).
4. The Agreement was further violated when the Carrier
failed to furnish the General Chairman with proper
advance written notice of its intention to contract out
said work and discuss the matter in good faith as
required by the Scope Rule.
5. As a consequence of the violations referred to in Parts
(1) and/or (4) above, Claimants R. E. Shaffer, M. E.
Stocum, C. L. Stocum, R. L. Dietz, J. Lynch, and R. G.
Jones shall each be allowed eight (8) hours pay at
their applicable straight time rates.
X938 --I
6. As a consequence of the violations referred to in Parts
(2) and/or (4) above, Claimants R. E. Shaffer, M. E.
Stocum, R. L. Dietz, J. Lynch, T. B. Cottingham and R.
G. Jones shall each be allowed ten (10) hours pay at
their applicable straight time rates.
7. As a consequence of the violations referred to in Parts
(3) and/or (4) above, Claimants R. E. Shaffer, M. E.
Stocum, R. L. Dietz, J. Lynch, T. B. Cottingham and R.
G. Jones shall each be allowed ten (10) hours pay at
their applicable straight time rates."
FINDINGS:
Public Law Board No. 5938, upon the whole record and all the
evidence, finds and holds that Employee and Carrier are employee
and carrier within the meaning of the Railway Labor Act, as
amended; and, that the Board has jurisdiction over the dispute
herein; and, that the parties to the dispute were given due
notice of the hearing thereon and did participate therein.
The claims in this matter arise from Carrier's having
contracted out the paving of certain railroad crossings. This is
not the first time that Carrier's contracting out of paving work
has come before a board. On April 5, 1991, Special Board of
Adjustment 1016 issued Awards Nos. 10, 11, and 12, sustaining
claims involving the contracting out of paving work. On November
9, 1994, the National Railroad Adjustment Board, Third Division,
issued a series of awards, of which Award No. 30540 was the lead
award, denying claims involving the contracting out of paving
work. On June 2, 1995, SBA 1016 issued Awards Nos. 82, and 8688, sustaining claims involving the contracting out of paving
work. On July 25, 1996, the NRAB Third Division issued Award No.
31523 denying claims which included the contracting out of paving
work.
The Organization contends that the awards of SBA 1016
control the instant case. The Organization argues that the Third
Division awards are palpably wrong and should not be followed.
The Third Division awards distinguished the SBA 1016 awards on
the ground that the SBA awards did not involve hot asphalt work.
The organization contends that there is no significant difference
between hot asphalt paving and cold patching. Furthermore,
according to the organization, the work at issue in the claims
before SBA 1016, tearing out and rebuilding a crossing, was the
same as the work involved in the instant case and in the claims
before the Third Division. The Organization also contends that
after the Third Division awards were issued, Carrier reargued the
matter before SBA 1016, and SBA 1016 reaffirmed its prior
rulings.
Carrier contends that two factors distinguish the SBA 1016
2
5qA-r
awards and make the Third Division awards controlling in the
instant case. Carrier argues that SBA 1016 did not consider the
differences between hot asphalt work and cold patching. Carrier
concedes that Organization-represented employees historically
have performed cold patching, but maintains that Carrier
consistently has contracted out hot asphalt paving. Carrier
maintains that it contracts out hot asphalt paving because of the
skills and special equipment required, equipment that Carrier
does not own and that would not make economic sense for Carrier
to own. Carrier urges that when the differences between hot
asphalt work and cold patching were presented clearly, the Third
Division recognized them and held that the Organization was not
entitled to perform the hot asphalt work. Carrier disputes the
Organization's contention that SBA 1016 subsequently reaffirmed
its position. Carrier argues that the later SBA 1016 awards
dealt only with disputes over which employees were entitled to
payment and did not consider the impact of the Third Division
awards.
In addition, Carrier contends that a key issue in the claims
before SBA 1016 was Carrier's failure to notify the General
Chairman of its intention to contract out the work. Carrier
maintains that ever since the SBA 1016 awards, it has given
notice and that it gave notice in the instant case. Carrier
urges that when it has given notice, the Third Division has
denied the claims. Carrier claims further support for its
position in Third Division Award No. 31483, involving CSX
Transportation, Inc., which, according to Carrier, found a mixed
practice of using contractors and Organization-represented
employees, and found no violation where the carrier gave proper
notice of its intent to subcontract.
The Organization agrees that no notice was given in the
claims before SBA 1016. The Organization counters, however, that
SBA 1016's holding was not limited to Carrier's failure to give
notice. Rather, in the organization's view, SBA 1016 found the
work at issue to be work historically-performed by Organizationrepresented employees. The Organization maintains that an
addendum to SBA 1016, Award No. 10 makes this clear.
The Scope Rule provides, in relevant part:
These rules shall be the agreement between Consolidated Rail
Corporation . . . and its employees of the classificationsherein set forth represented by the Brotherhood of
Maintenance of Way Employees, engaged in work generally
recognized as Maintenance of Way work, such as inspection,
construction, repair and maintenance of water facilities,
bridges, culverts, buildings and other structures, tracks,
fences and roadbed, and work which, as of the effective date
of this Agreement, was being performed by these employees,
and shall govern the rates of pay, rules and working
3
5839' _!
conditions of such employees.
In the event the Company plans to contract out work within
the scope of this Agreement, except in emergencies, the
Company shall notify the General Chairman involved, in
writing, as far in advance of the date of the contracting
transaction as practicable, and in any event not less than
fifteen (15) days prior thereto. "Emergencies" applies to
fires, floods, heavy snow and like circumstances.
If the General Chairman, or his representative, requests a
meeting to discuss matters relating to the said contracting
transaction, the designated representative of the Company
shall promptly meet with him for that purpose. Said Company
and organization representatives shall make a good faith
attempt to reach an understanding concerning said
contracting, but if no understanding is reached, the Company
may nevertheless proceed with said contracting and the
organization may file and progress claims in connection
therewith.
In Award No. 10, SBA 1016, held as follows:
[T[he record as a whole persuades that the disputed work of
paving (blacktop) and related clean-up at grade crossings .
. . falls within the purview of the Scope Rule . . . and
further that there is no question that the Carrier failed to
give the MofWE General Chairman notice of the contracting
out . . . . In these circumstances, the Board finds that
the manner in which the Carrier effected the disputed
contracting out of the paving and clean-up work at the two
grade crossings in question, was violative of the
confronting Agreement . . .
In other words, SBA 1016 found that because the work fell
within the Scope Rule, Carrier's failure to give notice violated
-the Agreement. In finding that the work fell within the scope
Rule, SBA 1016 focused on and rejected Carrier's argument that
the Organization had the burden to prove that it exclusively
performed the work. In an addendum, after an executive session,
the Board rejected Carrier's contentions that the Organization's
evidence was weak and lacking in specificity. The Board
reaffirmed its finding that the work fell within the Scope Rule
and specifically observed that "several items in the
Organization's evidence reflect that said paving work at grade
crossings was being performed by MW Employees . . . as of the
effective date of the BMWE Agreement."
SBA 1016, Award No. 10, did not hold that Carrier is
prohibited from contracting out paving work at grade crossings.
Rather, it held that the manner in which Carrier effected the
contracting out, i.e. by not first giving the Organization notice
4
593' -(
and an opportunity to meet and discuss the proposed contracting,
violated the Agreement.
The organization, however, contends that SBA 1016 did hold
that the contracting out of the paving work in issue violated the
contract independently of Carrier's failure to give notice. SBA
1016, Awards Nos. 82, 87 and 88 do state:
"[I]n line with this Board's precedent Award No. 10, the
Board finds that the paving and repair of crossings in
dispute in this case is (sic) covered by the BMWE Scope Rule
and that the Carrier provides no justifiable reason for
contracting out said work. Therefore, the Board finds that
the Carrier's actions in this matter violated the work
jurisdiction provisions and the advance notice provisions of
the Scope Rule in the Conrail-BMWE Agreement.
The Carrier's contention that the work of paving crossings
has historically been performed by 'off-railroad' companies
does not justify the contracting out of such work that is in
dispute in this case.
However, almost immediately thereafter, each award
reiterated the importance of the absence of advance notice of
intent to subcontract: "In view of this finding, it follows that
the Carrier was subject to the Scope Rule's requirement to give
the General Chairman fifteen (15) days advance notice of a
contracting out transaction." Furthermore, the lack of advance
notice was central to SBA 1016's finding that Carrier could not
provide a "justifiable reason for contracting out said work." As
SBA 1016 stated in Award No. 82, and reiterated in Award No. 86:
"The Carrier's argument that contracting out was necessary
due to a lack of Carrier-owned equipment is rejected for
lack of record support. The Carrier violated the Scope -
Rule's requirement to give notice to the Organization of
contracting out and thereby precluded a meeting by the
parties to discuss the proposed contracting out transaction.
The leasing of equipment, and possibly other alternatives,
could have been presented to the Carrier by the Organization
at such a meeting, but, as noted, the Carrier failed to give
the required notice and no meeting was held."
Thus, the failure to give notice was central to the sustaining of
all of the subcontracting of paving work claims before SBA 1016.
In Award No. 30540, the Third Division initially found that
Carrier complied with the notice requirements of the Scope Rule.
Specifically, the Third Division found:
5
5q3a--1
The record shows that the Carrier provided advance notice of
its intention to contract for work at a number of grade
crossings. The Organization argues that such notice is
insufficient . . . . The Board finds, however, that the
notice and subsequent meeting fulfilled the contractual
requirements of the Scope Rule . . .
Turning its attention to SBA 1016, Award go. 10, the Board
observed that the Award did not describe the type of paving at
issue with sufficient specificity to address Carrier's argument
that its employees had not performed hot asphalt paving on a
regular basis. The Board reviewed the evidence and concluded
that, although the organization had established that Maintenance
of Way employees regularly performed paving in general, it had
not established that they regularly performed hot asphalt work.
The Board concluded, "There is convincing evidence that the 'hot
asphalt' work has not been regularly performed by Carrier forces
and is not contractually reserved to them."
It is unclear what the Board in Third Division Award. No.
30540 meant by "not contractually reserved to them." It may have
meant that the Organization failed to prove that the Agreement
precluded Carrier from contracting out the work in the case
before the Board. Such a meaning follows from the order in which
the Board considered the issues. The Board first held that
Carrier satisfied the Scope Rule's notice and meeting
requirements. With such a finding, the only other live issue
that the Board might possibly have faced would have been whether,
in spite of complying with the notice and meeting requirements,
Carrier was precluded from contracting out the work.
The Scope Rule's notice and meeting requirements include a
requirement that the Carrier and organization "make a good faith
attempt to reach an understanding concerning said contracting."
The meeting thus presents the parties with the opportunity to
discuss the proposed contracting out, including such factors as
the degree to which the employees have performed the work in the
past and the availability of alternatives to contracting out the
work under consideration. That the results of these discussions
may be reviewed by a subsequent board is made clear by the Rule's
provision that "if no understanding is reached . . . the
organization may file and progress claims in connection" with the
subcontracting.
We read the Third Division's statement that the work was not
contractually reserved to the employees as a finding that the
organization's claim to the work in spite of the notice and
conference was particularly weak in light of the evidence
concerning the lack of regularity with which they had performed
the work of hot asphalt paving.
Read this way, we are unable to agree with the organization
6
9q
that the award is palpably wrong. Comparing the claims before
SBA 1016 with the claims before the Third Division makes it clear
that they involved the same type of paving, i.e., hot asphalt
paving. However, it also is clear that SBA 1016 never addressed
the question whether it was significant that the paving involved
hot asphalt. Third Division Award No. 30540 was the first
authority to address that question on this property. Indeed, the
thrust of the Labor Member's dissent was to the effect that the
use of hot asphalt was irrelevant:
"It should be recognized that the cold asphalt used for
patching material is simply hot mix asphalt which has been
allowed to cool and is usually surplus asphalt which is left
over from a previous (hot) paving job. Hot asphalt is much
more easily spread, compacted and smoothed and adheres much
more readily to existing paving than cold asphalt. For
these reasons, although it is the exact same material and
exactly the same skills and equipment are used for cold
patching and hot paving with asphalt, hot asphalt is
strongly preferred for paving work, including patching. The
reason that cold asphalt is often used for patching is
simply because it is impractical to keep hot asphalt readily
available for use in small quantities."
The contention that there was no significant difference
between hot and cold asphalt was answered on the property and in
the Carrier Members' response to the dissent. They pointed out
that hot asphalt requires equipment, such as an asphalt paving
machine, roller and insulated dump truck, not needed when cold
asphalt is used. Accordingly, we cannot find that Award No.
30540's distinction between hot and cold asphalt is palpably
wrong.
We have examined with considerable care the more than 100
employee statements that the organization submitted to
demonstrate that employees routinely performed hot asphalt
paving. Most of the statements were of very limited probative
value because they referred simply to paving in general and some
of those specifically mentioned cold asphalt work or pot hole
patching. Some statements did refer specifically to hot asphalt
work performed by employees. However, many of those referred to
work performed in the 1970s, and a few in the 1960s. Such
statements could not establish that the employees were performing
the work as of the effective date of the 1982 Agreement. A few
statements did refer to hot asphalt work performed in the early
1980s, but a number of others indicated that Carrier began
contracting out such work in 1979. In light of this record, we
cannot say that Award No. 30540's finding that the Organization
did not establish that the employees regularly performed hot
asphalt paving is palpably wrong.
Award No. 30540 also found that the Organization failed to
7
5~ 3~-r
carry its burden of proof with respect to Carrier's rejection of
the alternative of leasing the needed equipment. The Third
Division wrote:
"The parties are in dispute as to whether equipment could be
leased in order to have Carrier forces perform the work.
Given the extent of the hot asphalt paving program at the
time, it is unreasonable to assume that leased equipment
could be made available for this paving project encompassing
many different locations."
This finding also is not palpably wrong.
We agree with Carrier that the subsequent awards from SBA
1016, i.e., Awards Nos. 82, and 86-88, do not represent a
reconsideration of Award No. 10 in light of Third Division Award
No. 30540, and do not represent a rejection of Award No. 30540.
The subsequent SBA 1016 awards did not discuss Award No. 30540 at
all. The were concerned with arguments over whether specific
employees were entitled to payment, and, if so, to how much
compensation. They reaffirmed the Board's prior holding that
exclusivity was not required to trigger the notice provisions of
the Scope Rule. They also reiterated the importance of Carrier's
failure to give notice, rejecting Carrier's argument that it had
to contract out the work due to a lack of equipment because
Carrier's failure to give notice precluded the organization from
discussing other options, such as leasing the needed equipment.
Two subsequent Third Division awards reiterate the
importance of notice. In Award No. 31523, the Board denied the
claim and specifically found that the notice provided
sufficiently encompassed the paving work involved to satisfy the
requirements of the Scope Rule. In Award No. 31483, the Board
found that CSX Transportation, Inc., satisfied the requirements
under its Agreement with the organization where, when faced with
a mixed practice concerning paving work, it gave proper notice to
the Organization of its intention to contract out-such work on
specific jobs.
In the instant case, the Organization has argued that
Carrier did not meet its notice obligations. Based on our review
of the record, however, we cannot agree. It is clear that notice
was given and a meeting was held. Furthermore, we find that the
Organization has not carried its burden of showing that Carrier
acted inappropriately in rejecting the option of leasing the
needed equipment. Indeed, the record is devoid of evidence as to
what occurred at the meeting. Only after the claim was filed did
the Organization suggest one specific company that, it
maintained, could have rented Carrier the equipment. Carrier,
however, soundly refuted this suggestion, averring that its
investigation revealed that the company suggested by the
Organization did not stock a sufficient number of items to assure
8
5q 3S
-(
that Carrier could dependably rent the equipment with a set work
schedule. Carrier has consistently throughout all of the paving
cases maintained that leasing equipment is not a practical
option. The Organization failed to prove otherwise.
To summarize our holdings, because the work involved paving,
it was scope covered and Carrier was obligated to give notice and
meet with the Organization upon request. Carrier did give such
notice and did conduct the required meeting. Because the record
does not establish that the employees regularly and customarily
performed hot asphalt paving, however, the organization had a
relatively heavy burden to show that Carrier was precluded from
contracting out the work following a good faith discussion of
alternatives with the Organization. The Organization failed to
carry that burden in the instant case. Therefore, the claim must
be denied.
The Employee Member of the Board raised a concern that
denying the instant claim could be interpreted as authorizing
Carrier to fail to maintain or divest itself of its maintenance
of way equipment and contract out work that maintenance of way
employees have regularly performed, thereby undermining the
Agreement. No such result was intended or should be implied.
AWARD
Claim denied.
c~-
Martin H. Malin, Chairman
u n, S.V. Powers,
arrier Member Employee Member
Dated at Chicago, Illinois, February 10, 1998.
9
LABOR MEMBER'S DISSENT
TO
AWARD NO. 1 OF PUBLIC LAW BOARD NO. 5938
(Referee Malin)
This dissent is submitted with the utmost respect for the
Neutral Member's ability and integrity. However, even the best of
us get it wrong sometimes and in this case his award represents a
departure from the decisional paradigm established in decades of
contracting out precedent as well as the seminal awards by Referee
Blackwell which decided the grade crossing hot paving issue on this
property (SBA 1016, Award Nos. 10, 11, 82, 84, 85, 86, 87 and 88).
While the Neutral Member's award is a departure from decades of
well-reasoned and consistent- precedent,--it-is-recognized that he
had the misfortune of wandering into the morass created by the
unsound and self-contradictory reasoning of Third Division Award
30540 and its companion awards. At the outset, the Neutral Member
set for himself the impossible task of reconciling the seminal SBA
1016 awards with the irreconcilable Third Division Award 30540. No
one questions the good faith of the Neutral Member of PLB 5938, but
the task he set for himself was like pounding a square peg into a
round hole. It simply could not be done without mangling the peg
and the hole. Consequently, Award No. 1 of PLB 5938 should be
afforded -no precedential value not only because it departs from
established precedent, but because it is founded on Award 30540
which itself rests on false premises and is the fruit of blatant
forum shopping. The Labor Member does not stand alone in this
analysis. Fortunately, the very next arbitrator to confront the
morass (Arbitrator Eischen) issued Third Division Awards 32505 and
32508 which clearly cut through the confusion created by Third
Division Award 30540 and set the parties back on a course consistent with the facts, the rules and well-reasoned precedent,
including the seminal grade crossing paving awards on Conrail
issued by SBA 1016.
The lead award on hot paving of grade crossings on Conrail,
Award No. 10 of SBA 1016, was the subject of an extensive executive
session where Conrail's primary complaint was the alleged weakness
of BMWE's argument and evidence that paving grade crossings was
reserved to BMWE by the Scope Rule. After reviewing all of the
evidence and argument for a second time, Arbitrator Blackwell wrote
a special Addendum to Award No. 10 where he held:
°*** In this regard the Board observes that the preponderating evidence in the record as a whole has been
assessed as establishing that the disputed work comes
within the BMWE Scope Rule's coverage of work generally
recognized as Maintenance of Way work, such as
'...construction, repair and maintenance of... tracks'.
It is further noted that several items in the Organization evidence reflect that said paving work at grade
crossings was being performed by MW Employees on February
1, 1982, that is, as of the effective date of the BMWS
Agreement." (Emphasis added)
Labor Member's Dissent To Award No. 1
Of Public Law Board No. 5938
__.
Page Two
Award Nos. 11, 82, 84, 85, 86-, 87 and 88 of SBA 1016 followed
similar reasoning. Hence, it is clear that SBA 1016 determined
that hot asphalt paving of grade crossings was Scope covered not
only because it was being performed by Maintenance of Way employes
in 1982, but because it was work generally recognized as Maintenance of Way work, such as construction, repair and maintenance of
tracks.
Even after the extensive executive session which resulted in
the special Addendum to Award No. 10, Conrail refused to accept
this precedent and, in a blatant example of forum shopping, Conrail
progressed another set of BMWE's grade crossing claims to a new
forum (the NRAB) instead of settling them based on the existing
precedent. Apparently, Conrail believes precedent is binding only
when it favors the carriers. In any event, after successfully
shopping for a new forum, Conrail set about misleading the Neutral
Member in those cases (NRAB Docket MW-30707 and companion cases) by
asserting that the SBA 1016 awards concerned cold patch work and
were of no precedential value in cases involving hot paving of
grade crossings. This argument was patently untrue and is clearly
disproven by a careful reading of the SBA 1016 awards and case
records. Nevertheless, the Neutral Member in NRAB Docket MW-30707
was misled and rendered Award 30540 based on this false premise.
After confusing the facts and essentially reversing SBA 1016, Award
30540 goes on to contradict itself by stating that °*** [t]his
finding is not intended to contradict the Special Board of
Adjustment No. 1016 Awards...." Then, to compound its errors,
Award 30540 determined, without supporting evidence or sound
reasoning, that a simple asphalt roller was special equipment
requiring special skills and could not reasonably be leased. This
finding was in conflict with both specific and general precedent
concerning special skills and equipment. Specifically, Third
Division Award 8756 established long ago that, "[b]lacktopping is
not a new process and there is no showing of a special skill
requirement or special equipment being needed." The general
precedent (typified by Third Division Awards 7836, 9612 and 13237)
is that the carrier has an obligation to prove that it made a goodfaith attempt to obtain the necessary equipment by lease or other
means. No such proof existed in the record of Award 30540.
In Case No. 1 of PLB 5938, the Neutral Member, for all the
right reasons, got off to the wrong start and got mired in confusion. That is, it normally makes sense to reconcile precedent, but
in this case Award 30540 was so fundamentally mistaken on the basic
facts and the burden of proof that reconciliation with the well-reasoned SBA 1016 precedent was not logically-possible. The SBA
1016 awards clearly and unequivocally held that the disputed work,
hot paving of grade -crossings, was within the Scope of the
Agreement. In an effort to square Award 30540-with the findings of
Labor Member's Dissent To Award No. 1
Of PubLic Law Board No. 5938
Page Three
SBA 1016, the Neutral Member in this case seems to suggest that
there are degrees of Scope coverage that confer differing burdens
on the parties. This is akin to suggesting a partial pregnancy.
Just as a woman is pregnant or not, work is Scope covered or it is
not. Once Scope coverage is established, as it was in this case,
the overwhelming precedent (typified by Third Division Awards 4920,
5470, 6109, 6905, 7836, 8148, 9612, 13237, 19337 and 29823) holds
that the burden is shifted to the carrier to prove any affirmative
defense it raises to support its decision to contract out. Conrail
presented no such proof to show that it was unable to obtain the
necessary equipment through lease or rental.
The final attempt to reconcile the differing results of Award
30540 and the SBA 1016 awards centered on the notice and conference
issue. However, the fact that the carrier notified the union of
its intention to contract out the disputed work and held the
required conference in this case is simply further confirmation
that the work was within the Scope of the Agreement, i.e., the
notice and conference requirements apply only to "work within the
scope of this Agreement". Providing the required notice and
conference did not relieve the carrier of the obligation to prove
its affirmative defenses, nor did it distinguish the instant case
from the SBA 1016 precedent. Once again, the Labor Member does not
stand alone in this analysis. The very next arbitrator to confront
the grade crossing paving issue on Conrail plainly held in Third
Division Award 32508 that Conrail had complied with the notice and
conference requirements and then went on to sustain BMWE`s claim as
follows: -
"Turning to the merits of this dispute, it is patent
to all concerned that there are now two lines of cases on
the central question presented in this record. The
seminal decisions by Special Board of Adjustment No. 1016
(Referee Blackwell), Awards 9, 10, an arbitration
tribunal between these Parties on the property, held
unequivocally as follows: 'the disputed work of paving
(blacktop) and related clean-up at grade crossings . .
falls within the purview of the Scope Rule of the
confronting Maintenance of Way Agreement.' The determinations of SBA No. 1016 on this point were ostensibly
distinguished, but expressly not reversed, by the Third
Division in Award 30540 (Referee Marx), as follows
(Emphasis added): 'There is convincing evidence that the
"hot asphalt" work has not been regularly performed by
Carrier forces and is not contractually reserved to them.
This finding is not intended to contradict the Special
Board of Adiustment No. 1016 Awards, but it is based on
the Particular aspect of crossing work which is involved
here,
Labor Member's Dissent To Award No. 1
Of Public Law Board No. 5938
Page Four
"The 'convincing evidence' ostensibly relied upon by
the Board in Award 30540 (Referee Marx) and a series of
some 13 companion cases, (all but one of which were
decided by the same Referee who decided Award 30540), is
not persuasively made out on the record before us in the
instant case. Accordingly, we find no adequate basis for
declining to treat the decisions of SBA No. 1016 (Referee
Blackwell) in Awards 9, 10 et al as dispositive of the
present case." (Emphasis in bold added)
The Neutral Member in this case happened upon a universe which
included the SBA 1016 awards and Third Division Award 30540.
Because of the fundamental contradictions and flaws in Award 30540,
his good-faith intentions to make sense of this universe resulted
in an award that departs from decades of general precedent as well
as the on-property precedent that preceded (SBA 1016 awards) and
followed (Third Division Awards 32505 and 32508) this Award No. 1
of PLB 5938. For all of these reasons, I respectfully dissent.
Respectfully submitted,
Steven V. Powers
Labor Member