NATIONAL MEDIATION BOARD
PUBLIC LAW BOARD NUMBER 7048
BNSF RAILWAY
(former ATSF property)
(Carrier)
' and
BROTHERHOOD OF MAINTENANCE OF WAY EMPLOYEES DIVISION
(Organization)
PLB No. 7048 Case No. 1.0
Carrier File No. 14-06-0236
Organization File No. 90-13NI-0646
Claimant: Richard L. Algren
The Claimant was discharged from his position as a Track
Supervisor for a violation of Maintenance of Way Rule 1.6 - Conduct and
Rule 1.2.7 - Furnishing Information, for his alleged failure to inspect
track and for supplying accurate Federal Railroad Administration Track
-Inspection-Reports-a-nei-Pals-mfoixiat~on.:=Aiz-liauestiaive-Heaiang~uzas -
held on July 19, 2006 in Sherman, Texas before Daniel Rankin, Division
Engineer. The parties were unable to resolve their dispute, whereupon
the matter was appealed for adjudication by Public Law Board 7048.
PLB NO. 7048
Case 10
Claim of the System Committee of the Brotherhood that:
I . The Carrier violated the Agreement commencing August 22,
2006 when Claimant R.L. Algren, was removed from service
and dismissed for an alleged violation of Rules 1.6-Conduct
and 1.2.7-Furnishing Information, involving failure to
inspect track and failure to supply FRA track inspection
reports and false information; and
2. As a consequence of the violation referred to in part 1 the
Carrier shall reinstate the Claimant with all seniority,
vacation, all rights unimpaired and pay for all wage loss
commencing August 22, 2006, continuing forward and/or
otherwise made whole
This claim was discussed in conference between the parties.
NATURE OF THE CASE
According to the Carrier, the Claimant failed to inspect his territory
on July 3, 2006 and provided false information to Roadmaster
Michael J. Watkins, leading him to conclude that track had been
inspected and that the Claimant had properly entered Federal Railroad
Administration (FRA) Track Inspection Reports into the TIMS system.
the Creek and Madill Subdivisions from Tulsa, Oklahoma to Irving,
Texas, testified at the Investigatory Hearing that he was headed back
through Madill near Milepost 615 on Monday, July 3, 2006. According
to Roadmaster Watkins, the Claimant allegedly advised him during a
telephone conversation at approximately 2:40 p.m. that the Claimant
was a long distance from Mr. Watkins' location.
The Claimant acknowledged in his testimony that:
I came in on Monday morning to work on a switch in the yard,
didn't work out, got a little frustrated with it, about noon, I went to start
toning the dispatcher up to inspect track for about 2 hours. The
dispatcher would not even acknowledge that I was out there, and I guess
I got a little frustrated and I left. And as far as, for that day, you know
that's, I don't have any excuse for the not riding on inspector drive.
The Claimant also admitted that he did not notify his supervisor,
Roadmaster Watkins, that he was not going to inspect track on
July 3, 2006. The Claimant also acknowledged that at no time did he
inform Roadmaster Watkins that he had not ridden, i.e., inspected, track
on July 3, 2006. The Claimant, having acknowledged that he did not
inspect track on July 3, 2006, was unable to explain why there was an
official FRA Track Inspection Report in the TIMS system showing that he
had inspected track on July 3, 2006. The Claimant testified that:
I don't have any true explanation other than the fact that I entered
those inspections on a daily basis. I'm assuming out of habit I just, I
entered the inspection report on the next day. That's generally how I do
it.
PLB NO. 7048
Case 10
months, a position for which he had no formal practical training.
However, the Claimant testified that:
When I spoke to Mr. Watkins about obtaining the position, a
position, it is not a position that I can just bid on and be automatically
granted. It has to be gone through a few channels. His understanding in
me accepting the position, was that I didn't know everything and if I need
... If I had a question or needed assistance, that it would be there to not
4
PLB NO. 7048
Case 10
just, to not be absolutely disciplined for actions to be explained what,
what I'm doing wrong. If I'm doing wrong and what to look for when I
have a question. Like I said earlier, there is no intention in it whatsoever
[to file a false
FRA
report). It's out of habit. I filed it the next day. You
know like I said, I don't have any really true explanation for that. I don't
know why I filed it out of habit.
Notwithstanding this testimony, the Claimant apparently entered
an
FRA
report into the TIMS System falsely averring that he had
inspected track on July 3, 2006. No amount of inexperience can justify
filing a formal report indicating that track had been inspected when the
Claimant knew he had not conducted such an inspection. This action
erodes the Carrier's ability to rely on his honesty and to trust the
integrity of reports he submits in the future.
The Claimant further testified:
I'm familiar enough to enter the date, I guess, and how it was
conducted. What and what track was conducted. As far as entering
proper defects, removing when defects are supposed to be repaired or
shown repaired, I have no knowledge of that. While the only thing that I
figured out for myself is some of how to take a track out of service and I
just recently figured out. how to put it back in service within the last
couple of days.
or lack of training. He simply submitted a report for inspecting track on
July 3, 2006 when he conducted no such inspections. The fact that he
submitted the report the following day, July 4, 2006, which was a
holiday on which he did not work, neither exacerbates or mitigates his
inaccurate representation to the Carrier, and ultimately to the
FRA,
that
PLB NO. 7048
Case 10
he had inspected the main single track and four sidings on Sidings 7198,
7298, 7498 and 7701. The Claimant falsely specified that he inspected
four of the tracks by Hi-Rail and inspected Siding 7701 by walking.
That the Claimant entered an inspection on July 3, 2006 he had
performed the previous day, July 2, 2006 is immaterial to assessing his
misconduct.
The Claimant's conduct clearly violated Maintenance of Way
Rule 1.6, which specifies that "Employees must not be ... 2. negligent ...
4. dishonest". Rule 1.6 further provides "Any act of hostility, misconduct
or willful disregard or negligence affecting the interest of the Company or
its employees is cause for dismissal and must be reported. Indifference
to duty, or to the performance of duty, will not be tolerated." By either
negligently or intentionally permitting an official FRA report to be entered
into the TIMS system purporting to verify that the Claimant had
conducted an inspection of track on July 3, 2006, when the Claimant
subsequently admitted that he did not conduct such an inspection, the
Claimant committed serious misconduct and violated a duty of honesty
- - - - -------and fair dealing with the Carrier. The Claimant's relative inexperience
and lack of training in a position that he had held for more than three
months before July 3, 2006 is irrelevant to a charge of dishonesty.
PLB NO. 7048
Case 10
Neither does the record reflect that the Claimant was deprived of a
fair investigatory hearing. The Claimant was asked whether he had an
explanation for the apparent anomaly underlying his discharge, and
testified that he could not explain how he came to submit a report on
July 4, 2006 concerning inspections on July 3, 2006 other than by habit.
However, mere habit would not explain why the Claimant entered specific
track locations and inspection methods on a computer entry that was
time-stamped in a manner that verified the Claimant made the entry.
The Claimant's lack of a plausible reasonable explanation does not
invalidate the propriety of the investigatory hearing at which he was
offered ample opportunity to explain the evidence cited by the Carrier to
implicate the Claimant in serious misconduct.
The Organization contends that the Claimant was exhausted from
having worked seven days per week with no time off, and that he made
an inadvertent error in attempting to catch up on his paperwork. The
Claimant does not allege, however, that the entries he made on July 4
were other than for inspections he had purportedly carried out on July 3.
The Claimant did not testify that the reference to July 3 was erroneous,
and that he should have been documenting inspections he completed on
July 2. The Claimant's testimony, coupled with the credible version of
the conversations between the Claimant and Roadmaster Watkins on
July 3 about the Claimant's whereabouts and the activities in which he
PLB NO. 7048
Case 10
had been engaged, created a reasonable basis for the Carrier to doubt
the veracity of the Claimant's report.
No specialized training is necessary to impress upon employees
their obligation to be honest and forthright in providing information to
their employer, particularly information that will be submitted on the
employer's behalf to the Federal Railroad Administration and that could
form the basis of imposing a penalty on the Carrier or could jeopardize
the safety of employees and passengers using these rails. All employees
have a duty of honest dealing. This duty assumes greater importance
when the safety of the public and of co-workers may be jeopardized by
less than fastidious compliance with applicable reporting procedures,
much less manifest dishonesty by false misrepresentation of having
performed a series of track inspections. These reports were not simply
misdated. The Claimant was certifying that he performed specific
inspections on July 3, 2006 when he knew he had not done so.
As the Carrier contends in its November 3, 2006 reply to General
- --------- ---------
Chairman Hemphill, the role played on behalf of the Carrier by Division
Engineer Dan Rankin, who issued the notice of investigation, was the
conducting officer at the investigatory hearing, and issued the letter of
discipline does not invalidate the imposition of discipline or render the
investigatory hearing inherently unfair, as the record below contains
PLB NO. 7048
8 Case 10
inculpatory testimony by the Claimant. Moreover, the record below
clearly depicts that the Organization and the Claimant had adequate
opportunity to state their case, to explain the Claimant's actions, and to
cross-examine witnesses called by the Carrier. Even if the investigating
officer was predisposed to a decision supporting his initial determination,
the function of this Public Law Board is carefully to review the testimony
and documents in the evidentiary record to assure that the Carrier has
acted for just cause. There is no patent procedural defect that would
justify overturning the Carrier's evaluation of the Claimant's
uncontroverted admissions as a basis for imposing discipline.
The Claimant's credible testimony portrays him sympathetically as
an earnest employee who now recognizes that he made a serious
mistake. Although the Organization's plea that this mistake not
jeopardize the promising career of a potentially valuable railroad
employee is attractive, the Carrier reasonably characterized the
Claimant's action as indistinguishable from the type of falsification that
would be carried out by an employee who intended to deceive the Carrier
in order to disguise negligent or intentional dereliction of duty. Even if
the Claimant's intent was otherwise, his entry of specific track inspection
information for July 3, 2006 when he admits not having conducted such
inspections constituted serious misconduct that the Carrier cannot
reasonably be expected to ignore. Such misconduct leaves no basis for
PLB NO. 7048
Case 10
the Board to declare the Carrier's determination invalid and thus
overturn the penalty imposed. Perhaps the Carrier itself will relent in
view of the Claimant's evident remorse and his potential for future
redemption as a valuable employee. However, based on the evidence
submitted, there was just cause for the discharge of Richard L. Algren
The instant grievance is hereby denied.
We so find.
Dated:
~s-
Z-. --o 5V
Daniel F. Brent, Impartial Chair
( I concur. ( ) I dissent.
G Dated:
10/.3//06
Carrier Member
(L4-1'*c~oncur. { ) I dissent.
Dated:
Organization Member