SBA No. 1112
BNSFIBMW E
Case No. 47
Award No. 48
NATIONAL MEDIATION BOARD
SPECIAL BOARD OF ADJUSTMENT
BURLINGTON/NORTHERN/SANTA FE
Claimant:
] Virgil Dabney
AND
J CASE NO. 47
BROTHERHOOD OF MAINTENANCE J AWARD NO. 48
OF WAY EMPLOYEES J
]
On February 2, 2001 the Brotherhood of Maintenance of Way Employees
("Organization") and the Burlington Northem/Santa Fe ("Carrier") entend into an
Agreement establishing a Special Board of Adjustment in accordance with the provisions
of the Railway Labor Act. The Agreement was docketed by the National Mediation
Board as Special Board of Adjustment No. 1112 ("Board").
This Agreement contains certain relatively unique provisions concerning the
processing of claims and grievances under Section 3 of the Railroad Labor Act. The
Board's jurisdiction was limited to disciplinary disputes involving employees dismissed,
suspended, or censured by the Carrier. Moreover, although the Board consi::ts of three
members, a Carrier Member, an Organization Member, and a Neutral Referee. awards of
the Board only contain the signature of the Referee and they are final and binding in
accordance with the provisions of Section 3 of the Railroad Labor Act. .
Employees in the Maintenance of Way craft or class who have been d:smissed or
suspended from the Carrier's service or who have been censured may choos: to appeal
their claims to this Board. The employee has a sixty (60) day period from tle effective
date of the discipline to elect to handle his/her appeal through the usual channels
(Schedule Rule 40) or to submit the appeal directly to this Board in antuapation of
receiving an expedited decision. An employee who is dismissed, suspended, or censured
may elect either option. However, upon such election that employee waives any rights to
the other appeal procedure.
This Agreement further established that within thirty (30) days after a jisciplined
employee notifies the Carrier Member of the Board, in writing, of one's desire for
expedited handling of this appeal, the Carrier Member shall arrange to transm t one copy
of the notice of the investigation, the transcript of the investigation, the notice of
discipline and the disciplined employee's service record to the Referee.
Page 2 of 4
SBA No. 1112
BNSF/BM W E
Case No. 47
Award No. 48
These documents constitute the record of the proceedings and are to be reviewed by the
Referee.
The Agreement further provides that the Referee, in deciding whether the
discipline assessed should be upheld, modified, or set aside, will determine whether there
was compliance with Schedule Rule 40; whether substantial evidence was adcuced at the
investigation to substantiate the charges made; and, whether the discipline assessed was
arbitrary and/or excessive, if it is determined that the Carrier has met its burde:l of proof.
In the instant case, this Board has carefully reviewed each of the above-captioned
documents prior to reaching findings of fact and conclusions.
BACKGROUND FACTS
Claimant, Virgil Dabney, Relief Track Inspector, was charged with a tin (10) day
suspension with a one (1) year review period for his alleged failure to detect, c.)rrect and
protect variations from BNSF track standards. In addition, he was also chargal with
failure to ensure safe train operation at authorized speeds, at or near MP 58.17 on Main
Track # I on the Orin Subdivision in Gillette, Wyoming.
Roadmaster McCoy discovered a corrugated, crushed head rail defect cn Tuesday,
February 5, 2002 during a hy-rail inspection
trip,
wherein it was determined that a 10
MPH speed restriction should be imposed.An investigation was held on March 27, 2002
in the Burlington / Northern Same Fe Gillette Terminal building Conference R:)orn
located at 107 North Gillette One in Gillette, Wyoming. The record reflects thjt the
Claimant is charged with violating Maintenance of Way Engineering instructic ns, as
follows:
Item 2.1
Track inspection has two basic purposes:
First, it allows employees to detect, correct, and protect variati-ms from
SNSF track standards and to ensure safe train operations at authorized
speeds.
Second, it allows a planned program of repairs and improvements to
ensure that employees are productive and use materials efflcletMy.
Perform at least the minimum track inspections required in this section.
Page 3 of 4
SBA No. I i 12
BNSFfBMWE
Case No. 47
Award No. 48
Item 2.42
Track Inspectors and Track Supervisors have the following safety
responsibilities during inspections:
1. Be aware of train movement on or near the tracks being inspected.
Comply with operating rules and safety rules and use common ::ease.
2. If you detect unsafe conditions or deviations that exceed the allowable
fmlts, Initiate corrective or remedial action. Analyze irregular surface
and/ or alignment conditions by recording measurements on the Track
Supervisor's Track Measurement Notes ( see Figure 2-'l). Carry the
proper tools to handle routine track deviations that may be found during
the inspection.
3. If you cannot correct the couditlons, immediately protect the safety of the
railroad and notify the proper authority.
4. Properly inspect, maintain, and care for your vehicle.
It is the Carrier's position that upon a by-rail inspection that a corrugated, -rushed
head rail defect was discovered. Underneath the rail's crushed head, the Carrier asserts, a
deformation had developed which created a very serious condition: The concurrence of
these three factors, the Carrier contends, increased the likelihood of a train derailment as
the defect was approximately twenty- two (22) feet in length, with variations. Upon this
discovery, the Carrier adds, a slow order of 10 MPH was imposed to prevent a
t
accident
and to ensure the safety of train operations. It is the
position
of the Carrier du t the
Claimant failed to detect, correct, protect and ensure safe operations and thus -, iolated the
Maintenance of Way Instructions, Item 2.1 and Item 2.4.4. Based on all the above, the
Carrier requests that the Board deny the Claimant's appeal and affirm the ten (10) day
suspension with a one year (I) probation.
The Organization rebuts the Carrier's argument that the mere presence of a
corrugated, crushed head presents a danger and needs to be corrected with
a slow
order.
The Organization points out that several Track Inspectors agree such deviations are
commonplace and not serious defects in need of immediate correction. Both Supervisor
Denesha and Chief Operator Hill affiliated with Herzog told Track Inspector A lleman
Page 4 of 4
SBA No. I
t
12
BNSF/BMWE
Case No. 47
Award No. 48
who stated in turn conditions were safe, after looking at the rail in question. Specifically,
the Claimant also testified that Herzog Chief Operator Hill "got down on his knees" to
inspect the track. All concluded that the track needed no remedial nor correctiv: action,
the Organization counters. The Organization contends that the Claimant complied with
the prevailing Engineering Instructions encompassed in Item 2.1 and Item 2.4.z . Lastly,
the Organization adds the Claimant is a long-term employee without any prior
disciplinary infractions. Based on all the above, the Organization requests that Referee
vacate the ten (10) day suspension and sustain the Claimant's appeal.
After a careful review of the record, the Board finds that the Claimant's appeal
must be sustained for the following reasons. Evidence presented was overwhelmingly in
favor of the Organization. The Board finds that the collective opinion of two highlytrained Supervisors of Herzog, another Track Inspector as well as the Claimant, all
concur that the mere presence of either a corrugated rail and/or crushed head do not in
themselves present a dangerous condition. Moreover, they also concur that sue h
conditions do not require the imposition of an immediate 10 MPH slow order, is the
Carrier contends. In addition, the Board further finds that these described cond.tions do
not present a serious, imminent threat to safety in regards to circumstances wh ch could
increase the likelihood of a possible derailmcnt.
In response to the new revised regulations of March 1, 2002, the Board finds that
the Track Inspectors require notice before the imposition of discipline. That is, due
process requires that verbal as well as written notice be instituted, before a sus)ension
can be imposed for a failure to comply with a change of regulations or a new
interpretation of conditions. What is missing here is precisely what constitute! an
"unsafe condition" or a "serious deviation." Based on the foregoing, the ten (10) day
suspension and one (1) year probation must be vacated for the aforementioned reasons.
Award
The Claimant's appeal must be sustained.