SPECIAL BOARD OF ADJUSTMENT N0. 287
PARTIES: BROTHERHOOD OF MAINTENANCE OF WAY EMPLOYES
and
THE BALTIMORE AND OHIO RAILROAD COMPANY
AWARD IN DOCKET N0. 11
STATEMENT OF
CLAIM: "Claim of the System Committee of the Brotherhood that:
(1) The Carrier violated the Agreement when, without previous
negotiations with representatives of its Maintenance of Way and Structures Department employes, it assigned the work of repairing and remodeling Bridge No. 1823 to
outside forces.
(2) Each B&B employe holding seniority as such on the Wheeling
Division be allowed pay at their respective straight-time rates for an equal proportionate share of the total number of man hours consumed by outside forces in performing the work referred to in Part (1) of this claim."
FINDINGS: The requirements of the Carrier in contracting out work, as set forth
in Rule (b)5(a) were fully set forth in the Award in Docket No. 8.
They are adopted as a part of this Award.
This claim involves Bridge 1823. A contract for the performance of
this work was entered into with the Empire Construction Company on March 12, 1956,
at which time, Carrier asserts, "and for sometime previously, all B&B forces on the
Wheeling Division were continuously employed."
We must, then, examine this record to see if the facts justify
Carrier's reliance on any one of the 6 circumstances stipulated in Rule (b)5(a)
which would exclude the work in question from the application of the Agreement.
The work on Bridge 1823 was one part of a contract, which also covered
Bridge 1751, the two bridges being 0.7 miles apart.
Carrier relies on all 6 points of Rule (b)5(a). Much of the work on
this bridge project was performed by Company's B&B forces. The contractor obligated
itself to complete its share of the work within 90 days.
It is the Carrier's contention that it (the work on Bridges 1823 and
1751) would have taken Company forces a year and a half to complete if they could
have been assigned to it.
Carrier, at pages 210-213 of the Transcript, cites the detail of the
bridge work then being performed on the Wheeling Division by its B&B forces, which
was in addition to the bridge work then being performed by contractors.
We must and will conclude, therefore, that the Carrier has fully met
its burden of proof in this case, particularly with respect to (b)5(a)
6,
and the
claim will be denied.
Sg A a8 r7
DOCKET N0. 11
Claim denied.
(s) A. J. Cunningham
A. J. Cunningham
Employee Member
Dated at Baltimore, Maryland,
this 28th day of March,
1960.
(a) Edward A. Lynch
Edward A. Lynch
Chairman
(s) T. 5. Woods
T. S. Woods
Carrier Member