SPECIAL ADJUSTMENT BOARD NO. 947
Award No.9
Case No. 9
PARTIES
Brotherhood of Maintenance of Way Employes
TO and
DISPUTE Southern Pacific Transportation Company (Western
Lines)
STATEMENT 1. That the Carrier violated the provisions of
OF CLAIM
the Agreement when, after a formal hearing -
held on June 16, 28, 29, and 30, 1983, they
suspended Mr. Severo Oliverez for a period of
thirty (30) days, effective August 9, 1983 -
September 7, 1983, for allegedly violating
Rule 13 of the Rules for the Safe Operation
and Care of Automotive and Trailer Equipment
of the Southern Pacific Transportation
Company; said action being excessive and
unjust.
2. That all charges against Mr. Oliverez be
dismissed, his record cleared, and he be
compensated for any time lost as a result of
these charges.
FINDINGS
Upon reviewing the record, as submitted, I find that the Parties
herein are Carrier and Employes within the meaning of the
Railway Labor Act, as amended, and that this Special Board of
Adjustment is duly constituted and has jurisdiction of the
Parties and the subject matter, with the arbitrator being sole
signatory.
On April 4, 1983, Mr. Severo Oliverez was assigned to transport
Speedswing SPO-239 from Suisun to Cresta. He
urzod two ln!iq
SBA No. 947 Award No. 9
case No. 9
chains and two chain binders to secure the Speedswing onto a
tiltbed trailer, which was hooked onto dump truck W-739. Around
8:14 A.M., while enroute, in the vicinity of MP 53.0 near
Suisun, one of the chains broke causing the Speedswing 'to roll
off the trailer and land upside down on the roadway. When the
Speedswing rolled off the trailer, the front of the trailer
tipped up which in turn lifted the back wheels of the truck.
Consequently, Mr. Oliverez, the driver lost control; the traileY
jackknifed and the truck overturned. Mr. Oliverez and one of
the two passengers with him in the truck were slightly injured.
The total damage to the equipment was in excess of $10,000.00.
The Company said nothing to Mr. Oliverez regarding the accident
until June 6, 1983, when he was handed a letter which notified
him of a formal hearing which was to be held on June 16, 1983.
The hearing was set up to determine if the accident on April 4,
1983 resulted from his negligence in violation of Rule 13 of the
Rules for the Safe Operation and Care of Automotive and Trailer
Equipment of the Southern Pacific Transportation Company..
Subsequent to the hearing, Mr. Oliverez was found responsible
for the accident because he had failed to secure the Speedswing
to the trailer in a proper manner. '
The Company claimed the driver was responsible. for making sure
he had the right chains for the job. Instead of having heat
treated chains he had regular chains. The Company witnesses
also testified that it would have been preferable to use four
2
SBA No. 947 Award No. 9
Case No. 9
chains instead of the two chains used by Mr. Oliverez. Two heat
treated chains could have been used if secured properly to the
axle of the Speedswing. This was especially necessary since
there were no hooks on the Speedswing to attach to. Therefore,
the chains should have been placed through the front and rear D
rings on the trailer and then around the differential housing
(large axle) on the Speedswing, attaching the left front housing
to the left front D ring on the trailer with the other three
ends attached to their respective front and rear corners.
Instead Mr. Oliverez, attached the chains to the center D rings
on both sides of the trailer. He did not properly secure the
chain around the axle, therefore when one of the chains broke,
the Speedswing worked loose and rolled off the trailer. The
driver also failed to used the required four chain binders.
Instead he used just two. The Grievant in response testified he
had used the chains given to him by his Supervisor, Mr. Flores
and the only reason for the accident was the fact the chain
broke. Otherwise, he had properly secured the Speedswing. He
also testified that someone was always taking his chains and his
request for chains was always denied instead he was directed to
look for additional chains in other trucks.
Quite frequently in cases such as this, no one becomes upset
until something happens. It would appear Mr. Oliverez's
Supervisor was aware of the type of chains used by the Grievant.
He had some responsibility to be sure the chains issued the
employe were up to specifications. In all probability the type
a
SBA No. 947 Award No. 9
Case No. 9
of
chains used resulted in one of the chains breaking which
caused the accident. Even the report of the CHP Officer
indicated that to be the case. However, there is no
indication
the Grievant ever protested the type of chains he was issued nor
is there evidence he attempted to obtain four shorter
heat-treated chains which would have secured the Speedswing more
efficiently. Instead, using two long chains, he tied down the
Speedswing in the same
manner he
may have secured things in the
past not expecting any difficulties. Evidence suggests that if
the chains had been properly secured around the axle of the
Speedswing, the Speedswing would have stayed in place even if
one end became loose. The same would probably have been true
when the chain broke.. It appears Mt. Oliverez did not properly
stabilize the Speedswing onto the trailer. As a result, when
the chain snapped, the Speedswing shifted.
Management must share at least some of the responsibility in not
assuring that the type of chains issued met the proper
specifications. The Supervisor also erred in the lengthy delay
in questioning Mr. Oliverez and raising the issue concerning his
possible responsibility in causing the accident. This type of
delay is unfair to the employe and could conceivably interfere
with his ability to
present an
adequate defense of allegations
brought by the Company.
Taking all the above into consideration, I believe the penalty
issued to Mr. Oliverez was excessive.
4
SBA No. 947 Award No. 9
Case No. 9
AWARD
The claim is sustained in part; the penalty issued to Mr.
0liverez is to be reduced to fifteen (15) days; he is to be
reimbursed for any time lost, as a result of this. incident,
in excess of this amount.
ORDER
The Company shall comply with the Award _
herein within thirty (30) days from the date
hereof.
Carol J. /Z ini //Neutral
Submitted:
.
Denver, Colorado
July 17, 1984