|
Claimant, D.L. Wullenweber, has been employed by the Carrier since 1994. On March 22, 2013, the Carrier notified Claimant to attend an investigation to ascertain the facts and determine his responsibility, if any, in connection with his alleged failure to apply proper remedial action to the frog portion of the switch at the west end of Riverbank on the Stockton Subdivision on Monday, March 18, 2013, in Riverbank, California, after determining that it did not meet the minimum requirements for tread wear per FRA Track Safety Standard 213.137 Frogs. The Notice stated that the investigation would determine possible violation of Maintenance of Way Operating Rule (MOWOR) 1.13 Reporting and Complying with Instructions and Engineering Instruction (El) 11.4.3 Ensuring Safe Train Movement. Following the investigation, the Carrier determined that Claimant had committed the violations alleged and assessed him a Level S 30-day record suspension with a one-year review period.
|
|